Name | Type | Posted | Actions |
|---|---|---|---|
DAF Terms and Conditions.pdf | May 6, 2026 | ||
Clauses_FA489726QA022.pdf | May 6, 2026 | ||
PWS-Fitness Equipment Maintenance_29April.pdf | May 6, 2026 | ||
FA489726QA022-RFQ_Gym Equipment Mx.pdf | May 6, 2026 | ||
WD-2015-5513 rev 28 dated 30 Mar 2026.pdf | May 6, 2026 |
Gym Equipment Maintenance
Contact and place of performance
Katie Sanderson
Mountain Home AFB, ID 83648
USA
The Contractor shall provide on-site preventative maintenance and equipment repair services, and ensure all maintenance and repairs are documented in a maintenance repair log. All preventative maintenance shall be done according to the manufacturer’s specifications to ensure it remains serviceable, reduce frequency of equipment repairs and extend the life of the equipment. The contractor shall take every measure within the scope of this performance work statement (PWS) to ensure all known and/or identified discrepancies are corrected or repaired during the quarterly PM visit. The only exception for any delay would be based on the availability of replacement parts.
The Department of the Air Force, 366 CONS PKP, has issued a combined synopsis/solicitation under solicitation number FA489726QA022 for gym equipment maintenance services at Mountain Home AFB, Idaho. This requirement is designated as an SBA (SBA) set-aside and is classified under NAICS code 811490, Other Personal and Household Goods Repair and Maintenance, and PSC J078, which covers the maintenance, repair, and rebuilding of recreational and athletic equipment. Responses are due by May 20, 2026, and Katie Sanderson is the designated point of contact.
The contractor will provide on-site preventative maintenance and repair services designed to extend the life of equipment and ensure all units remain serviceable according to manufacturer specifications. Performance includes conducting quarterly maintenance visits to correct identified discrepancies and documenting all actions in a maintenance repair log. Delays in repairs are only permitted based on the availability of replacement parts. The solicitation includes five attachments: the DAF Terms and Conditions, a clause document, the performance work statement dated April 29, the request for quotation, and a wage determination dated March 30, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.