PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA
Contact and place of performance
Tyrone M. Brown,
Wallops Island, VA
USA
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any pa...
View moreThe Department of the Army, through the U.S. Army Engineering and Support Center Huntsville, is soliciting services for a pre-demolition survey of various buildings at the NASA Wallops Flight Facility in Wallops Island, Virginia. This requirement is designated as a total set-aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB). The primary classification for this effort is NAICS 238910 Site Preparation Contractors and PSC P400 Salvage- Demolition of Buildings. Responses to solicitation W912DY26RA086 are due by June 4, 2026.
The project objective involves planning and completing environmental sampling for identified facilities to determine the presence of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). The contractor must perform a Waste Stream Analysis for RCRA 8 metals, lead-based paint, and PCBs-in-paint for all potentially painted components. Following the sampling effort, which includes comprehensive access to exteriors, roofs, and basements, the contractor will quantify environmental contamination and define safe removal and disposal methods in accordance with federal, state, and local regulations.
Laboratory testing and analysis must be completed within a specified timeframe following field activities. The final deliverable is an individual Pre-Demolition Assessment Report providing site investigation results and identifying any areas that were inaccessible during the survey. This solicitation was published on May 22, 2026, and includes three attachments: the solicitation document, a performance work statement, and a price spreadsheet. Tyrone M. Brown serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.