Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 29, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 29, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 29, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9126G26RA019¬iceType=Presolicitation | LINK | Apr 29, 2026 |
Climate Controlled Storage Facility
Contact and place of performance
Kristi MORRIS
Not specified
**This notice ID: W9126G26RA019 is being issued to correct a clerical error and is replacing notice ID: W912626RA019.** // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. See attached Pre-Solicitation Notice for details.
The U.S. Department of the Army, specifically the W076 ENDIST FT WORTH office, is issuing this pre-solicitation notice for a design-bid-build construction project to deliver a climate-controlled storage facility at the Red River Army Depot in Texas. This requirement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1GZ for Construction of Other Warehouse Buildings. The procurement is designated as a 100% Small Business Set-Aside (SBA).
This notice, identified by solicitation number W9126G26RA019, replaces a previous notice (ID: W912626RA019) to correct a clerical error. Technical specifications and project details are contained within one PDF attachment published on April 29, 2026. Kristi Morris is the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.