Name | Type | Posted | Actions |
|---|---|---|---|
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S225U0797¬iceType=CombinedSynopsisSolicitation | LINK | May 19, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 19, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 19, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | May 19, 2025 |
Diamond SK DISC MULCHER BD PRO X
Contact and place of performance
Carrie Lawton
Not specified
1. Diamond SK Disc Mulcher BD Pro X 2. Cuts up to 14 inch diameter trees 3. 13 Spool- up time4. Flow rates up to 50 GPM5. High Torque Belt Drive6. Two- speed hydraulic motor7. Wide and narrow intake 8. Equipped with bolt on ramp for feed9. Cutting head will be capable of cutting mulching material with its entire bottom plane, in addition to its cutting edge.10. Bolt on tooth holders11. Bolt on 4-point hardened teeth1...
View moreSolicitation W911S225U0797 identifies a requirement for a Diamond SK Disc Mulcher BD Pro X, categorized under NAICS 333924 for Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing and PSC 3720 for HARVESTING EQUIPMENT. The equipment must feature a 60-inch wide cutting path and the capability to cut trees up to 14 inches in diameter with a 13-second spool-up time. The procurement includes an equipment quick attach work tool changing system, onsite factory training, and onsite field service tuning to calibrate the mulcher head to the machine.
The technical specifications for the mulcher include a high torque belt drive, a two-speed hydraulic motor, and flow rates up to 50 GPM. The unit must be equipped with a bolt-on ramp for feed, bolt-on tooth holders with 4-point hardened teeth, and planer knives in the center for dead zones. The cutting head must be capable of mulching material with its entire bottom plane and its cutting edge. For safety and durability, the machinery requires a rear chain guard, replaceable inner liners, and 1-inch ID high-pressure hydraulic hoses with a burst pressure four times the working pressure.
Delivery is required at Fort Drum, New York, within 120 days after receipt of the order. Two copies of all operators, service, and parts manuals must be provided upon delivery. Responses are due by May 27, 2025, and all submitted pricing must remain in effect until September 30, 2025. Carrie Lawton is the designated point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.