Name | Type | Posted | Actions |
|---|---|---|---|
Atch_49-_Statement_of_Objectives_(SOO)_for_RKMF_19-0080_Rev_24Sept19.pdf | Sep 24, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Sep 24, 2019 | ||
Solicitation_Amendment_-_FA486119RA0090009.pdf | Sep 24, 2019 | ||
Atch_04-_SABER_Specs_Rev_24Sept19.pdf | Sep 24, 2019 | ||
Solicitation_Amendment_FA486119RA0090009_SF_30.pdf | Sep 24, 2019 | ||
Atch_53-_Revised_SABER_RFIs_24Sept19.pdf | Sep 24, 2019 | ||
Solicitation_Amendment_FA486119RA0090008_SF_30.pdf | Sep 16, 2019 | ||
Solicitation_Amendment_FA486119RA0090007_SF_30.pdf | Sep 5, 2019 | ||
Atch_04-_SABER_Specs_29Aug19.pdf | Sep 5, 2019 | ||
Atch_52-_19RA009_SABER_RFIs_and_Historical_Data.pdf | Sep 5, 2019 | ||
Atch_49-_SOO_RKMF-190080_RPR_Rest_Rms_&_Infrastructure_99_FSS_B-20.pdf | Sep 5, 2019 | ||
Atch_02-_FA486119RA009_Section_L.pdf | Sep 5, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Sep 5, 2019 | ||
Atch_02-_FA486119RA009_Section_L.pdf | Aug 20, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Aug 20, 2019 | ||
Solicitation_Amendment_FA486119RA0090006_SF_30.pdf | Aug 20, 2019 | ||
Atch_02-_FA486119RA009_Section_L.pdf | Aug 15, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Aug 15, 2019 | ||
Solicitation_Amendment_FA486119RA0090005_SF_30.pdf | Aug 15, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Jul 31, 2019 | ||
Atch_02-_FA486119RA009_Section_L.pdf | Jul 31, 2019 | ||
Solicitation_Amendment_FA486119RA0090004_SF_30.pdf | Jul 31, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Jul 22, 2019 | ||
Atch_51-_19RA009_Preproposal_Site_Visit_(Slides_and_Sign-In_Sheet).pdf | Jul 22, 2019 | ||
Solicitation_Amendment_FA486119RA0090003_SF_30.pdf | Jul 22, 2019 | ||
Atch 45- Past Peformance Information Sheet.pdf | Jul 17, 2019 | ||
Atch_00-_SABER_List_of_Attachments.pdf | Jul 17, 2019 | ||
Atch 46- Subcontractor Teaming Partner Consent Form.pdf | Jul 17, 2019 | ||
Atch 23- UM3-14 VEA Standards.pdf | Jul 17, 2019 | ||
SABER_Atchmts_21-26.zip | ZIP | Jul 17, 2019 | |
Atch 25- UM33 VEA Standards.pdf | Jul 17, 2019 | ||
Atch 44- Teaming List.pdf | Jul 17, 2019 | ||
Atch 21- Power Trench Sand and Backfill Requirements.pdf | Jul 17, 2019 | ||
Atch_04-_SABER_Specs_16Jul19.pdf | Jul 17, 2019 | ||
SABER_Atchmts_44-48.zip | ZIP | Jul 17, 2019 | |
Atch_34-_Progress_Report_Template.pdf | Jul 17, 2019 | ||
Solicitation_Amendment_FA486119RA0090002_SF_30.pdf | Jul 17, 2019 | ||
Atch 22- UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed.pdf | Jul 17, 2019 | ||
Atch 47- Sample Client Authorization Letter.pdf | Jul 17, 2019 | ||
Atch 48- Past Performance Questionnaire.pdf | Jul 17, 2019 | ||
Atch 24- UG17-2 VEA Standards.pdf | Jul 17, 2019 | ||
Atch 26- UM48-2 Multi-Grounds.pdf | Jul 17, 2019 | ||
Solicitation_Amendment_FA486119RA0090001_SF_30.pdf | Jul 3, 2019 | ||
Atch 36- Submittal Register.pdf | Jul 2, 2019 | ||
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/57132e76785dbed39504f962c19ec8eb/download?&token= | FILE | Jul 2, 2019 | |
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/16080585e9491ce828fa4623e7675754/download?&token= | FILE | Jul 2, 2019 | |
19RA009_SABER_Attch_22-27.zip | ZIP | Jul 2, 2019 | |
19RA009_SABER_Attch_20-21.zip | ZIP | Jul 2, 2019 | |
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ebaf4e3fc2e8b43c0052c35cb82ab4a8/download?&token= | FILE | Jul 2, 2019 | |
Solicitation_-_FA486119RA009.pdf | Jul 2, 2019 | ||
Atch 25- UM33 VEA Standards.pdf | Jul 2, 2019 | ||
Atch 22- UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed.pdf | Jul 2, 2019 | ||
Atch 23- UM3-14 VEA Standards.pdf | Jul 2, 2019 | ||
Atch 47- Sample Client Authorization Letter.pdf | Jul 2, 2019 | ||
Atch 31- AF Form 103_Base Civil Engineering Work Clearance Request.pdf | Jul 2, 2019 | ||
19RA009_SABER_Attch_28-38.zip | ZIP | Jul 2, 2019 | |
Atch 46- Subcontractor Teaming Partner Consent Form.pdf | Jul 2, 2019 | ||
Atch 06- Nellis-Creech IFS appendix Comm Req.pdf | Jul 2, 2019 | ||
Atch 40- WDNV190038-20180075.pdf | Jul 2, 2019 | ||
Atch 00- SABER List of Attachments.pdf | Jul 2, 2019 | ||
Atch 42- WDNV190012-20180012.pdf | Jul 2, 2019 | ||
Atch 02- FA486119RA009 Section L.pdf | Jul 2, 2019 | ||
Atch 16- UR2 S Primary and Secondary Trenching Requirements.pdf | Jul 2, 2019 | ||
Atch 08- Nellis-Creech IFS appendix Lighting Req.pdf | Jul 2, 2019 | ||
Atch 30- Nuclear Gauge Request Form 2.pdf | Jul 2, 2019 | ||
Atch 29- Nuclear Gauge Form 1.xlsx | XLSX | Jul 2, 2019 | |
19RA009_SABER_Attch_00-14.zip | ZIP | Jul 2, 2019 | |
Atch 15- UM1-6C 3-Phase Pad and Vault.pdf | Jul 2, 2019 | ||
Atch 20- Bulletin 1728F-806 UG Main VEA standard.pdf | Jul 2, 2019 | ||
Atch 14- USAF Integrated Cultural Resources Mgmt Plan.pdf | Jul 2, 2019 | ||
Atch 50- B20 AsBuilts.pdf | Jul 2, 2019 | ||
Atch 10- Nellis-Creech IFS appendix Utility Meter Req.pdf | Jul 2, 2019 | ||
Atch 48- Past Performance Questionnaire.pdf | Jul 2, 2019 | ||
Atch 45- Past Peformance Information Sheet.pdf | Jul 2, 2019 | ||
Atch 01- PriceSchedule.pdf | Jul 2, 2019 | ||
Atch 37- Material Submittal Approval.pdf | Jul 2, 2019 | ||
Atch 43- Quality Control Plan.pdf | Jul 2, 2019 | ||
Atch 07- Nellis-Creech IFS appendix Electrical Req.pdf | Jul 2, 2019 | ||
Atch 33- Progress Schedule Template.xls | XLS | Jul 2, 2019 | |
Atch 12- ACC Sole Source EMCS Letter.pdf | Jul 2, 2019 | ||
Atch 35- Schedule of Vaules Template.xlsx | XLSX | Jul 2, 2019 | |
Atch 41- WDNV190024-20180061.pdf | Jul 2, 2019 | ||
Atch 11- Environmental Permit Guidance.pdf | Jul 2, 2019 | ||
Atch 03- FA486119RA009 Section M.pdf | Jul 2, 2019 | ||
Atch 34- Progress Report Template.pdf | Jul 2, 2019 | ||
Atch 27- VEA CONNECTION CHARGE AGREEMENT.docx | DOCX | Jul 2, 2019 | |
Atch 05- Nellis-Creech IFS appendix Fire Protection Req.pdf | Jul 2, 2019 | ||
Atch 18- UM33 200 Amp 3-Phase CJE 4 inch Conduit Placement Standards.pdf | Jul 2, 2019 | ||
Atch 49- SOO for RKMF 19-0080.pdf | Jul 2, 2019 | ||
Atch 32- Cost Estimate Template.xlsx | XLSX | Jul 2, 2019 | |
Atch 04- SABER Specs 13May19.pdf | Jul 2, 2019 | ||
Atch 19- UM33 3-Phase CJE Conduit Placement Standards.pdf | Jul 2, 2019 | ||
Atch 17- UM3-14 1-Phase CJE Conduit Placement Standards.pdf | Jul 2, 2019 | ||
Atch 38- BUILDER inventory sheet.xls | XLS | Jul 2, 2019 | |
Atch 28- NTTR Visit Request.pdf | Jul 2, 2019 | ||
Atch 26- UM48-2 Multi-Grounds.pdf | Jul 2, 2019 | ||
Atch 39- WDNV190001-20180001.pdf | Jul 2, 2019 | ||
Atch 09- Nellis-Creech IFS appendix Mech-Plumb Req.pdf | Jul 2, 2019 | ||
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5f3d744d888d8f134275a6cd2d141f01/download?&token= | FILE | Jul 2, 2019 | |
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a1ea50b5bf6dbc017d00db427b8ae9c9/download?&token= | FILE | Jul 2, 2019 | |
19RA009_SABER_Attch_15-19.zip | ZIP | Jul 2, 2019 | |
Atch 44- Teaming List.pdf | Jul 2, 2019 | ||
Atch 24- UG17-2 VEA Standards.pdf | Jul 2, 2019 | ||
Atch 21- Power Trench Sand and Backfill Requirements.pdf | Jul 2, 2019 | ||
Atch 13- NAFB Plan 32-7086 Hazardous Materials Management Plan.pdf | Jul 2, 2019 |
Nellis/Creech AFB Simplified Acquisition of Base Engineering Requirements (SABER) Solicitation
Contact and place of performance
Angela Mendoza
NELLIS AFB, NV 89191
USA
No narrative description provided for this notice.
The Department of the Air Force, specifically the 99 CONS LGC, has issued solicitation FA486119RA009 for the Simplified Acquisition of Base Engineering Requirements (SABER) at Nellis and Creech Air Force Bases in Nevada. This requirement falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z for Maintenance, Repair, or Alteration of Real Property. The acquisition is designated as a HUBZone set-aside, identified by the acronym and code HZC.
The performance of work is centered at Nellis Air Force Base, Nevada. The solicitation process included a series of amendments and supplemental documentation, with 100 total attachments provided, including a Statement of Objectives, technical specifications, and a consolidated list of requests for information. Responses to this combined synopsis and solicitation were required by October 9, 2019. Angela Mendoza is the designated point of contact for this federal opportunity.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.