Name | Type | Posted | Actions |
|---|---|---|---|
GD-OTS_Kick-Off_Meeting_Combined_Slides_-_Distribution_Code_D.pdf | May 8, 2019 | ||
W52P1J15R0033-0004.pdf | Jun 8, 2016 | ||
HH6A06POM2_SECTC_REV_C.pdf | Jun 7, 2016 | ||
13044446-HH6A06POM2.zip | ZIP | Jun 7, 2016 | |
Instructions_to_open_TDPs.doc | DOC | Jun 7, 2016 | |
HH6A06PQM2_SECTC_REV_B.pdf | Jun 7, 2016 | ||
13031777-HH6A06PQM2.zip | ZIP | Jun 7, 2016 | |
Instructions_to_open_TDPs.doc | DOC | Jun 7, 2016 | |
13028739-HH6A06PPM2.zip | ZIP | Jun 7, 2016 | |
HH6A06PPM2_SECTC_REV_C.pdf | Jun 7, 2016 | ||
Instructions_to_open_TDPs.doc | DOC | Jun 7, 2016 | |
13028737-HH6A06BR1A.zip | ZIP | Jun 7, 2016 | |
Instructions_to_open_TDPs.doc | DOC | Jun 7, 2016 | |
HH6A06BR1A_SECTC_REV_C.pdf | Jun 7, 2016 | ||
W52P1J15R0033-0001.pdf | Jun 2, 2016 | ||
W52P1J15R0033-0003.pdf | Jun 2, 2016 | ||
Exhibit_A_-_Contract_Data_Rquirements_List_(CDRLs)_Rev_B_01_June_2016.pdf | Jun 2, 2016 | ||
W52P1J15R0033-0002.pdf | May 19, 2016 | ||
W52P1J-15-R-0033_Amendment_0001.pdf | May 18, 2016 | ||
HH6A06PNM2_SecCRevA.pdf | May 17, 2016 | ||
13013654-HH6A06PNM2.zip | ZIP | May 17, 2016 | |
HH6A06CJM2_SecC.pdf | May 17, 2016 | ||
13038142-HH6A06CJM2.zip | ZIP | May 17, 2016 | |
T16A06CIHH_SECTC_REV_B.pdf | May 17, 2016 | ||
13038141-T16A06CIHH.zip | ZIP | May 17, 2016 | |
HH6A06CH1A_SecCRevA.pdf | May 17, 2016 | ||
13038140-HH6A06CH1A.zip | ZIP | May 17, 2016 | |
12977144-HH6A06PMM2.zip | ZIP | May 17, 2016 | |
HH6A06PMM2_SecC.pdf | May 17, 2016 | ||
T16A06PLHH_SecC.pdf | May 17, 2016 | ||
12953279-T16A06PLHH.zip | ZIP | May 17, 2016 | |
Attachment_0010_-_Disclosure_of_Lobbying_Activities.pdf | May 9, 2016 | ||
Attachment_0011_-_Security_SOW_Cat_III_IV.pdf | May 9, 2016 | ||
Attachment_0012_-_Defense_Priorities__Allocations_System_-JMC_Form_715-03.pdf | May 9, 2016 | ||
Attachment_0013_-_OPSEC_Acquisition_Plan_-_SAMPLE.pdf | May 9, 2016 | ||
Attachment_0014_-_Address_Code_Distribution_for_ECP-RFD-VECP.pdf | May 9, 2016 | ||
Attachment_0015_-_Address_List.pdf | May 9, 2016 | ||
Attachment_0016_-_Statement_of_Work_-_Full_Cutaway_and_Complete_Inert_Models.pdf | May 9, 2016 | ||
Attachment_0018_-_DD1694_-_Request_for_Variance_(RFV).pdf | May 9, 2016 | ||
Attachment_0019_-_DD1695_-_Notice_of_Revision_(NOR).pdf | May 9, 2016 | ||
Attachment_0017_-_DD1692_-_Engineering_Change_Proposal_(ECP).pdf | May 9, 2016 | ||
Attachment_0020_-_Government_POC_Listing.pdf | May 9, 2016 | ||
Exhibit_A_-_Contract_Data_Rquirements_List_(CDRLs).pdf | May 9, 2016 | ||
Attachment_0002_-_Past_Performance_Questionnaire.docx | DOCX | May 9, 2016 | |
Attachment_0003_-_Contract_Participation_Matrix__Instructions.xlsx | XLSX | May 9, 2016 | |
Attachment_0004_-_52.246-4520_End_Item_Component_Listing.pdf | May 9, 2016 | ||
Attachment_0006_-_Guidance_on_Documentation_of_Contract_Requirements_List_(CDRL).pdf | May 9, 2016 | ||
Attachment_0005_-_Government_Furnished_Material_(GFM)_Listing.pdf | May 9, 2016 | ||
W52P1J-15-R-0033.pdf | May 9, 2016 | ||
Attachment_0001_-_Price_Evaluation_Spreadsheet.xls | XLS | May 9, 2016 | |
Attachment_0007_-_Instructions_on_Completing_DD_Form_1423.pdf | May 9, 2016 | ||
Attachment_0008_-_Statement_of_Work_(SOW)_-_Accountability_Instructions.pdf | May 9, 2016 | ||
Attachment_0009_-_ASC_Form_715-7_-_Hazardous_Material.pdf | May 9, 2016 |
13--AMMUNITION, OVER 30MM UP TO 75MM
Contact and place of performance
BRIDGET L. KRAMER,(309)782-0896 or DONNA S. PONCE,(309)782-4535 ARMY CONTRACTING COMMAND - RI
Not specified
No narrative description provided for this notice.
The Department of the Air Force, through the W4MM USA Joint Munitions Command and the Army Contracting Command - RI, issued solicitation W52P1J15R0033 for ammunition over 30mm up to 75mm. This requirement is classified under NAICS 332993 Ammunition (except Small Arms) Manufacturing and PSC code 13. Bridget L. Kramer and Donna S. Ponce are the designated points of contact for this procurement.
The notice was initially published on March 15, 2016, and was last updated on May 8, 2019. Documentation for this opportunity consists of 53 attachments, including various technical data packages, instructions for opening those packages, and presentation materials such as the GD-OTS Kick-Off Meeting Combined Slides. Specific technical revisions for parts like HH6A06POM2 and HH6A06PQM2 are included within the secondary attachments and ZIP files.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.