Name | Type | Posted | Actions |
|---|---|---|---|
Contractor_Questions_for_RFP_W56HZV19R0005_-_Parachute_Items.docx | DOCX | Jul 29, 2019 | |
W56HZV19R0005.pdf | Jul 24, 2019 | ||
W56HZV19R0005-0003.pdf | Jul 24, 2019 | ||
W56HZV-19-R-0005-0002.pdf | Jul 18, 2019 | ||
W56HZV19R0005-0001.pdf | Jul 3, 2019 | ||
Attachment_0002_-_Section_D_Packaging_Requirements_RA-1_Parachute_Items.pdf | Jun 18, 2019 | ||
Attachment_0005_-_TDPLs_RA-1_Parachute_Items.pdf | Jun 18, 2019 | ||
Attachment_0004_-_DOD_Detail_Spec_Parachutes_Personnel_MIL-DTL-6645J.pdf | Jun 18, 2019 | ||
Attachment_0003_-_Qualified_Product_List_(QPL)_MIL-DTL-6645.pdf | Jun 18, 2019 | ||
Attachment_0006_-_First_Article_Waiver_Worksheet.pdf | Jun 18, 2019 | ||
Attachment_0001_-_RA-1_Parachute_Items_Years_1-5.xlsx | XLSX | Jun 18, 2019 |
Contractor Questions for RFP W56HZV-19-R-0005 (RA-1 Parachute System Items)
Contact and place of performance
Daniel C. Poehling
Not specified
Contractor Questions for RFP W56HZV-19-R-0005 (RA-1 Parachute System Items) 1. Could you clarify Production time allowed for Products with FAT? 150 Days with FAT Using the following assumptions: Section I - 102 FAR 52.209-3 First 90 days (30 Day notification to US GOV for Test Date and Production.) After the First Article Test US GOV can take up to 45 Days to Approve. 90 Days + 45 Days = 135 Leaves 15 Days for produc...
View moreThe US Army Corps of Engineers, supporting civil program financing, is soliciting proposals for RA-1 Parachute System items under solicitation number W56HZV19R0005. This combined synopsis/solicitation is categorized under NAICS 314999, All Other Miscellaneous Textile Product Mills, and PSC code 16. The procurement includes a five-year ordering period with a guaranteed minimum quantity for each item to be established in the first delivery order. Proposals are due by July 31, 2019, and the primary point of contact is Daniel C. Poehling.
The scope of work involves the production and delivery of various parachute system components, including the D-Bag (NSN: 1670-01-623-5865) and other miscellaneous textile products. Technical requirements specify First Article Testing (FAT) procedures, where contractors must provide reports within 60 days, followed by a 30-day government approval window. Production delivery timelines following FAT approval range from 60 to 150 days depending on the specific item, though the government may consider alternate delivery schedules proposed by contractors. For items where FAT is not waived, testing costs are incorporated into the total cost for the respective item on the initial delivery order.
Administrative documentation for this notice includes eleven attachments such as packaging requirements, multiple solicitation amendments, and a consolidated list of contractor questions and answers. Technical Data Packages (TDP) for this requirement include components with both unlimited public release and restricted distributions; however, a non-disclosure agreement is not required to access the restricted portions. Maximum contract quantities encompass the total projected requirements for years one through five, and while the minimum quantity is guaranteed for the first year, subsequent order frequency remains undetermined.
Generated by Lumen AI