No attachments available.
Y--Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for facilities in the North Integrated Product Team (IPT) AOR
Contact and place of performance
Philip J. Cole (757) 341-1970 [email protected]
Not specified
The work includes providing fall protection railing systems for rooftops with equipment near edges at buildings 40, 88, 153, 157, 325, 456 and 478. Provide interior hanging storage for single door flood protection units. At Building 17, Renovate toilet room, locker room and add new toilet room with a concrete ramp up to toilet room and office space. At Building 88, provide sprinklers under mezzanines in Wellness Cent...
View moreThe Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic has issued an award notice for solicitation N4008516R3015, an Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). The contract covers facilities located within the North Integrated Product Team (IPT) area of responsibility. This procurement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC code Y for construction of structures and facilities.
The scope of work involves various facility improvements and repairs across multiple buildings. Specific tasks include installing fall protection railing systems for rooftops at buildings 40, 88, 153, 157, 325, 456, and 478, as well as providing interior hanging storage for flood protection units. Interior renovations are required for toilet rooms, locker rooms, and office spaces at buildings 17 and 89, including the construction of a concrete ramp. Building 88 requires the installation of sprinklers under mezzanines and in the west wing, alongside repairs for window leaks.
Additional requirements involve providing humidification to laboratories and altering roof access ladders for OSHA compliance at building 153. Infrastructure repairs at building 533 include work on the entryway landing, lobby, and turnstiles, as well as the addition of exterior sidewalks and stairs. At building 478, residential-sized ceiling fans will be replaced with large industrial units. The notice was published on June 8, 2017, and the primary point of contact is Philip J. Cole.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.