Name | Type | Posted | Actions |
|---|---|---|---|
Combined Solicitation Documents Asphalt.pdf | Aug 1, 2023 |
Blanket Purchase Agreement for Purchase of Asphalt
Contact and place of performance
Cyndy Armour
Bend, OR 97701
USA
This will set up parent Blanket Purchase Agreements for the supply of Asphalt to the Ochoco and Deschutes National Forests. The parent BPAs will from date of award through November 30, 2025. This project consists of furnishing and potentially delivering hot mix asphaltconcrete. Materials to be loaded into Forest Service dump trucks at the asphaltbatch plant or delivered and placed at work sites on paved Forest Serviceroads. Supply will be on an as needed basis during the field season (June-October)with an estimated minimum need of (3) truck/transfer and a maximum of (15)truck/transfers per day depending on proximity of the work site to the asphalt plant.
The USDA Forest Service, Deschutes National Forest, has issued this combined synopsis/solicitation under solicitation number 1240BE23Q0124 to establish parent Blanket Purchase Agreements (BPAs) for the supply of asphalt to the Ochoco and Deschutes National Forests. This requirement is categorized under NAICS 324121, Asphalt Paving Mixture and Block Manufacturing, and PSC 5610, Mineral Construction Materials, Bulk. The procurement is designated as an SBP (Small Business Program) set-aside.
The scope of work includes furnishing and potentially delivering hot mix asphalt concrete for Forest Service projects. Materials will either be loaded into Forest Service dump trucks at an asphalt batch plant or delivered and placed at work sites located on paved Forest Service roads in Bend, Oregon. Supplies are required on an as-needed basis during the field season, typically occurring from June through October, with daily needs estimated between three and fifteen truck/transfer loads depending on the proximity of the work site to the plant.
The performance period for these parent BPAs begins at the date of award and continues through November 30, 2025. Responses to this solicitation are due by August 16, 2023, and the primary point of contact is Cyndy Armour. One attachment, titled Combined Solicitation Documents Asphalt.pdf, was provided with the notice on August 1, 2023.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.