Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 8_Q and A Sanding Booth V3.pdf | May 26, 2026 | ||
Attachment 7_Q and A Sanding Booth V2 (5.21.26).pdf | May 21, 2026 | ||
Attachment 6_Tobyhanna_Installation Planning Design Guide.pdf | May 18, 2026 | ||
Attachment 7_Q and A Sanding Booth V1.pdf | May 18, 2026 | ||
Solicitation W51AA1-26-Q-A045.pdf | May 13, 2026 | ||
Attchment 1_Performance Work Statement (PWS).pdf | May 13, 2026 | ||
Attachment 2_Exhibit A_ CDRL 1_ Sanding Booth.pdf | May 13, 2026 | ||
Attachment 5_Dust Explosivity Report_Jan2025_Redacted.pdf | May 13, 2026 | ||
Attachment 4_SandingBooth-dimensions_.pdf | May 13, 2026 | ||
Attachment 3_Exhibit B_CDRL 2_Sanding Booth.pdf | May 13, 2026 |
SANDING BOOTH- Tobyhanna
Contact and place of performance
Kristen Zigmont
Tobyhanna, PA 18466
USA
This Solicitation is in accordance with Revolutionary FAR Overhaul (RFO) 12.201-1 and (RFO) Subpart 19.104-1, as applicable. This requirement is a Total 100% Small Business Set-Aside. Requirement will meet or exceed the Minimum Specifications listed in the Statement of Work. This requirement is for a Firm Fixed Price supply contract and will be conducted as a requirement, pursued IAW Revolutionary...
View more-REAL ID IS REQUIRED TO ENTER ON BASE AT TOBYHANNA.
-See Attachments for full details of the requirement.
**Attachement 8 Final Q & A updated and added 5/26/2026**
The Department of the Army, ACC-APG TYAD Office, is soliciting for a sanding booth to be installed at Tobyhanna, Pennsylvania. This requirement is a total 100% Small Business Set-Aside (SBA) and will result in a firm-fixed-price supply contract for equipment that meets or exceeds the minimum specifications in the statement of work. The procurement is classified under NAICS 332311 for Prefabricated Metal Building and Component Manufacturing and PSC 3694 for Clean Work Stations, Controlled Environment, and Related Equipment.
This solicitation, identified by number W51AA126QA045, is conducted as an acquisition of commercial items under Revolutionary FAR Overhaul (RFO) Part 12. All submissions must be received by May 27, 2026, at 1:00 PM EST. The project schedule included a site visit on May 21, 2026, and a deadline for technical questions on May 22, 2026. Access to the performance location at Tobyhanna requires a REAL ID and the completion of specific forms for base entry.
Kristen Zigmont is the primary point of contact for this solicitation. The notice includes 10 total attachments, including the Performance Work Statement (PWS), a Tobyhanna Installation Planning Design Guide, and three iterations of question-and-answer documents. The final version of the question-and-answer attachment was added during a metadata update on May 26, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.