12445526Q0035_0004.pdf | Apr 1, 2026 | ||
Solicitation QAs_0003.pdf | Mar 31, 2026 | ||
Sol_12445526Q0035_Amd_0002.pdf | Mar 24, 2026 | ||
Solicitation QAs_0002.pdf | Mar 24, 2026 | ||
DBA_WINDSOR_VT.pdf | Mar 23, 2026 | ||
12445526Q0035.pdf | Mar 20, 2026 | ||
Solicitation QAs.pdf | Mar 20, 2026 | ||
GMNF Rochester Fleet Garage_Photos.docx | DOCX | Mar 20, 2026 | |
Part 12 Combined Synopsis_Solicitation_12445526Q0035.pdf | Mar 5, 2026 | ||
GMNF Rochester Fleet Garage_BASE BID SOI.pdf | Mar 5, 2026 | ||
GMNF Rochester Fleet Garage_OPTIONAL BID SOI.pdf | Mar 5, 2026 | ||
GMNF Rochester Fleet Garage_Specifications.pdf | Mar 5, 2026 | ||
GMNF Rochester Fleet Garage_Plans.pdf | Mar 5, 2026 | ||
GMNF Rochester Fleet Garage_Product Data Sheets.pdf | Mar 5, 2026 |
GMF Rochester Ranger District Office Fleet Garage
Contact and place of performance
Brad Higley
VT 05767
USA
April 1, 2026 - Extend the closing date until April 13, 2026. March 31, 2026 - Add a revised Q&A document. March 24, 2026 - Add a revised Q&A document. March 23, 2026- The estimated magnatude of this project is between $500,000 and $1,000,000. March 30, 2026: This amendment add a Q&A document. The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester,...
View moreThe USDA Forest Service, CSA EAST 13, has issued solicitation 12445526Q0035 for the construction of a fleet garage at the Rochester Ranger District Office within the Green Mountain National Forest. This project is classified under NAICS 238190 Other Foundation, Structure, and Building Exterior Contractors and PSC Y1GZ CONSTRUCTION OF OTHER WAREHOUSE BUILDINGS. This procurement is designated as an SBA SBA set-aside.
The scope of work requires providing and installing a pre-engineered building with an exterior designed to match the appearance of the existing Rochester Workshop. The contractor or building manufacturer is responsible for the design of foundations to be placed below frost depth. The building will include a concrete slab floor, power, lighting, site work, and other miscellaneous items as specified in the project plans.
The estimated magnitude of this project is between $500,000 and $1,000,000. Performance will occur in Rochester, Vermont, and the response deadline is April 13, 2026. Brad Higley serves as the primary point of contact for this solicitation. The notice includes 14 attachments, including multiple revised Q&A documents, amendments, and Davis-Bacon Act wage determinations for Windsor, Vermont.