Name | Type | Posted | Actions |
|---|---|---|---|
36C26126R0038 0001.docx | DOCX | May 21, 2026 | |
Site Visit Attendees List 05-20-2026.pdf | May 21, 2026 | ||
Attachment 654-22-003 Specifications.pdf | May 13, 2026 | ||
Attachment Exhibit A 654-22-003 Drawings.pdf | May 13, 2026 | ||
Attachment Price Breakdown 654-22-003.xlsx | XLSX | May 13, 2026 | |
36C26126R0038_2.docx | DOCX | May 13, 2026 | |
Attachment REQUEST FOR INFORMATION FORM 654-22-003.docx | DOCX | May 13, 2026 | |
Attachment Wage Determination NV20260040 01-30-2026.pdf | May 13, 2026 | ||
Attachment Pre-solicitation Site Visit Presentation 654-22-003.pptx | PPTX | May 13, 2026 | |
Attachment VAAR 852.219-75 JAN 2023 DEVIATION.pdf | May 13, 2026 | ||
Attachment SOW 654-22-003.pdf | May 13, 2026 |
Z1DB--Replace Dietetics and Cath Lab Flooring, Buildings 1 and 1D Reno, NV Project # 654-22-003 Reno, NV
Contact and place of performance
Yuliya V Kochkina
Not specified
AMENDMENT-DESCRIPTION The purpose of this amendment is to provide the information mentioned below: The site visit attendees are listed on the attached document labeled "Site Visit Attendee List 05-20-2026." All other terms and conditions remain unchanged and are in full force and effect. (END OF AMENDMENT-DESCRIPTION)
The Department of Veterans Affairs has issued solicitation 36C26126R0038 for a construction project to replace flooring within the Dietetics and Cath Lab facilities at Buildings 1 and 1D in Reno, Nevada. This requirement, identified as Project # 654-22-003, involves work classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z1DB for Maintenance of Laboratories and Clinics. Proposals are due by June 12, 2026, following a recent amendment that provided an attendee list from the site visit conducted on May 20, 2026.
The procurement documentation includes 11 attachments, featuring technical specifications, architectural drawings, and a price breakdown spreadsheet. Yuliya V Kochkina serves as the primary point of contact for this solicitation. All project components, including labor and materials, must adhere to the provided specifications to ensure the maintenance of these specialized clinical and laboratory environments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.