Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 29, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 29, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 29, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3340¬iceType=CombinedSynopsisSolicitation | LINK | May 29, 2026 |
Live Fire Range Targets
The Department of the Army, through the Mission and Installation Contracting Command (MICC) at Fort Drum, is procuring Live Fire Range Targets. This requirement is a combined synopsis/solicitation set aside for small businesses. The primary goal is to acquire specific targetry equipment, including the 25 Meter Universal Zeroing Target (MOA-25), to support live fire range operations. A recent amendment modified the salient characteristics of the MOA-25 target. Responses are due by June 5, 2026. The procurement falls under NAICS code 332994 (Small Arms, Ordnance, and Ordnance Accessories Manufacturing) and PSC code 6920 (Training Aids and Devices). All offers must be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module, which requires specific account registrations and role assignments for compliance with Department of Defense electronic bidding standards. A recent amendment updated the salient characteristics for the 25 Meter Universal Zeroing Target (MOA-25) to ensure equipment meets current Army marksmanship training standards. The Army is procuring Live Fire Range Targets for MICC-FT DRUM to support training operations. The primary requirement is the 25 Meter Universal Zeroing Target (U.S. Army), which must meet specific salient characteristics defined in the solicitation amendments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Donald Nicholson
29207
Live Fire Range Targets reason for amendment is to change Salient Characteristics in [MOA-25] 25 Meter UniversalZeroing Target U.S. Army