Solicitation - FA488726R0008.pdf | Jun 2, 2026 | ||
Attachment 8 - RFI Log - 11 May 26.xlsx | XLSX | Jun 2, 2026 | |
Attachment 10 - Section L Instructions Conditions and Notices to Offerors.pdf | Jun 2, 2026 | ||
Attachment 9 - Past Performance Questionnaire.docx | DOCX | Jun 2, 2026 | |
Attachment 7 - WD - AZ20260039_AZ20260057 dated 18 May 26.pdf | Jun 2, 2026 | ||
Attachment 11 - Section M Evaluation Criteria.pdf | Jun 2, 2026 | ||
Attachment 6 - Anti-Terrorism Pamphlet - 5 Jan 23.pdf | Jun 2, 2026 | ||
Attachment 4 - First 400 Standards dated 4 Mar 15.pdf | Jun 2, 2026 | ||
Attachment 5 - Asbestos Report dated 20 Feb 26.pdf | Jun 2, 2026 | ||
Attachment 1 - SOW - FOC From ITB910 to ITB1365 dated 28 May 25.pdf | Jun 2, 2026 | ||
Attachment 3 - DAFMAN 91-203 dated 24 Feb 26.pdf | Jun 2, 2026 | ||
Attachment 2 - Luke Master Specs dated 7 Mar 25.pdf | Jun 2, 2026 |
Install New FOC from ITB 910 to ITB 1365
The Department of the Air Force, 56 Contracting Squadron, is seeking proposals for fiber optic cable (FOC) installation at Luke Air Force Base in Arizona. The project requires the engineering, furnishing, installation, and testing (EFI&T) of 36-strand single-mode fiber optic cable to connect Information Transfer Building (ITB) 910 with ITB 1365. Work includes installing approximately 1,300 feet of new conduit, 6,500 feet of geo-textile innerduct, and a new network cabinet for outside plant infrastructure. This procurement is a 100% set-aside for SBA Certified Women-Owned Small Businesses (WOSB) with a 180-calendar day period of performance. Evaluation will follow a Performance Price Tradeoff (PPT) methodology with Technical Acceptability, where technical and past performance factors are roughly equal to price. Funding is currently available, though the government may cancel the solicitation. Key dates include a mandatory site visit on June 9, 2026, an RFI deadline on June 15, 2026, and final electronic proposals due by June 30, 2026. The scope includes 1,300 feet of new conduit and 6,500 feet of geo-textile innerduct. Technical execution must follow Air Force 'First 400 Feet' standards and safety protocols in DAFMAN 91-203. The period of performance is 180 calendar days. Adhere to technical standards for outside plant infrastructure and intra-building telecommunications wiring.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
TSgt Laura Negley
Luke Air Force Base, AZ 85309
USA
The Department of the Air Force, 56 Contracting Squadron, is solicitating a request for proposal for Install New Fiber Optic Cable (FOC) from Information Transfer Building (ITB) 910 to ITB 1365 at Luke Air Force Base, Arizona. Please reference the documents attached to this RFP which provide all details of the required work to be performed. A site visit is scheduled for Tuesday 9 June 2026 at 0900am MST (Arizona does...
View moreNotice to Offeror(s): Funds are presently available for this effort. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.