Name | Type | Posted | Actions |
|---|---|---|---|
KC-135 CCR Questions for Industry Day 2026.03.16.pdf | May 28, 2026 | ||
Draft Solicitation - FA810526RB001 21 May 26.pdf | May 26, 2026 | ||
Attachment 2. (CUI) KC-135 CCR SRD.pdf | May 26, 2026 | ||
2. Attachment 2. (CUI) KC-135 CCR DRAFT SRD.pdf | May 21, 2026 | ||
Draft Solicitation - FA810526RB001 21 May 26 (1).pdf | May 21, 2026 | ||
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf | May 21, 2026 | ||
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx | XLSX | May 21, 2026 | |
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx | XLSX | May 21, 2026 | |
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf | May 21, 2026 | ||
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf | May 21, 2026 | ||
(CUI) DRAFT RFP Round Two.pdf | May 21, 2026 | ||
B45 ELA 818-3812-001_Rev_A (2).pdf | May 11, 2026 | ||
CUI KC-135 CCR Industry Day Responses-3.pdf | May 7, 2026 | ||
CUI KC-135 CCR Industry Day Responses-3.pdf | May 6, 2026 | ||
CUI KC-135 CCR Industry Day Responses-3.pdf | May 6, 2026 | ||
(CUI) KC-135 CCR Baseline Configuration.pdf | May 6, 2026 | ||
TO 00-5-16.pdf | May 5, 2026 | ||
(CUI) KC-135 CCR Baseline Configuration.pptx | PPTX | May 5, 2026 | |
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf | May 5, 2026 | ||
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf | Apr 28, 2026 | ||
(U) AFRL MBSE Style Guide v2-1.zip | ZIP | Apr 23, 2026 | |
(U) AFRL MBSE Style Guide v2-1.docx | DOCX | Apr 23, 2026 | |
CUI KC-135 CCR Industry Day Responses-2.pdf | Apr 15, 2026 | ||
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf | Apr 15, 2026 | ||
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf | Apr 15, 2026 | ||
CUI KC-135 CCR Industry Day Responses.pdf | Apr 3, 2026 | ||
Tinker PDM Aircraft Tour for KC-135 CCR.pdf | Apr 3, 2026 | ||
(CUI KC-135 TO 1C-135-1-1-3.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf | Apr 3, 2026 | ||
(U) readme to use this style guide - external.txt | TXT | Apr 3, 2026 | |
OMG SysML Ver 1.6.pdf | Apr 3, 2026 | ||
KC-135 TO 1C-135-WA-1-1898M.pdf | Apr 3, 2026 | ||
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf | Apr 3, 2026 | ||
(U) template_for_exfil.docx | DOCX | Apr 3, 2026 | |
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf | Apr 3, 2026 | ||
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf | Apr 3, 2026 | ||
CUI_Industry Day 1 and 2 Q and A.pdf | Apr 3, 2026 | ||
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf | Mar 27, 2026 | ||
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf | Mar 24, 2026 | ||
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx | XLSX | Mar 16, 2026 | |
DRAFT Solicitation - FA810526RB001.pdf | Mar 16, 2026 | ||
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf | Mar 16, 2026 | ||
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx | XLSX | Mar 16, 2026 | |
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf | Mar 16, 2026 | ||
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf | Mar 16, 2026 | ||
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf | Mar 16, 2026 | ||
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf | Mar 16, 2026 | ||
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf | Mar 16, 2026 | ||
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf | Mar 16, 2026 | ||
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf | Mar 16, 2026 | ||
KC-135 CCR Industry Day Flyer.pdf | Mar 16, 2026 | ||
MEMO Draft Solicitation FA810526RB001.pdf | Mar 16, 2026 | ||
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx | XLSX | Mar 10, 2026 | |
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx | XLSX | Mar 10, 2026 | |
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf | Mar 10, 2026 | ||
DRAFT Solicitation - FA810526RB001.pdf | Mar 10, 2026 | ||
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf | Mar 10, 2026 | ||
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf | Mar 4, 2026 | ||
KC-135 CCR Industry Day Flyer.pdf | Mar 4, 2026 | ||
MEMO Draft Solicitation FA810526RB001.pdf | Mar 4, 2026 | ||
Draft Solicitation FA810526RB001.pdf | Mar 4, 2026 | ||
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf | Mar 4, 2026 | ||
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf | Mar 4, 2026 | ||
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf | Mar 4, 2026 | ||
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf | Mar 4, 2026 | ||
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf | Mar 3, 2026 | ||
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf | Mar 3, 2026 | ||
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf | Mar 3, 2026 | ||
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf | Mar 3, 2026 | ||
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf | Feb 27, 2026 | ||
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf | Feb 27, 2026 | ||
KC-135 CCR Revision TO 1-1-300.pdf | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO List (Jan 22- 2024).pdf | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-10.pdf | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF | Feb 18, 2026 | ||
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF | Feb 18, 2026 | ||
(CUI) KC-135 SCG Final Oct 2022.pdf | Feb 5, 2026 | ||
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf | Jan 13, 2026 | ||
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf | Jan 13, 2026 | ||
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf | Jan 13, 2026 | ||
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf | Dec 17, 2025 | ||
(CUI) CCR Industry Day.pdf | Dec 17, 2025 | ||
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf | Dec 5, 2025 | ||
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf | Nov 21, 2025 | ||
CUI Draft SOW KC-135 CCR Rev 2.pdf | Nov 21, 2025 | ||
(CUI) Update KC-135 CCR 19 Nov 25.pdf | Nov 19, 2025 | ||
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf | Nov 14, 2025 | ||
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf | Nov 14, 2025 | ||
(CUI) DRAFT KC-135 CCR SRD.pdf | Sep 26, 2025 | ||
(CUI) Draft SRD KC-135 CCR Memo Signed.pdf | Sep 26, 2025 | ||
(CUI) Update KC-135 CCR 28 Aug 25.pdf | Aug 28, 2025 | ||
OMG SysML Ver 1.7.pdf | Aug 13, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) _KC-135 Program Protection Plan.pdf | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf | Jul 15, 2025 | ||
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf | Jul 15, 2025 | ||
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf | Jul 15, 2025 | ||
AFMC Form 718 Provisioning Performance Schedule.pdf | Jul 15, 2025 | ||
AWB-130 Airworthiness Bulletin Certification Basis.pdf | Jul 15, 2025 | ||
AWB-140 Airworthiness Bulletin Compliance Report.pdf | Jul 15, 2025 | ||
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf | Jul 15, 2025 | ||
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision System Requirements Document (SRD) February 5 2023.pdf | Jul 15, 2025 | ||
Initial Provisioning Performance Specification (IPPS).docx | DOCX | Jul 15, 2025 | |
OMG SysML Ver 1.6.pdf | Jul 15, 2025 | ||
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf | Jul 15, 2025 | ||
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf | Jul 15, 2025 | ||
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf | Jul 15, 2025 | ||
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf | Jul 15, 2025 | ||
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf | Jul 15, 2025 | ||
DoD 8500.pdf | Jul 15, 2025 | ||
afi63-101_20-101.pdf | Jul 15, 2025 | ||
afi63-101_20-101_aetcsup.pdf | Jul 15, 2025 | ||
afman17-1301.pdf | Jul 15, 2025 | ||
afman17-1301_afrssup.pdf | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF | Jul 15, 2025 | ||
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf | Jul 2, 2025 | ||
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf | Jun 6, 2025 | ||
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf | Apr 14, 2025 | ||
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx | DOCX | Apr 14, 2025 | |
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx | DOCX | Jan 31, 2025 |
KC-135 Center Console Refresh (CCR) Revision 2
Contact and place of performance
Brandi Shelden
S Coffeyville, OK 73145
USA
03 June 26 - SPECIAL ANNOUNCEMENT To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition. Vendor...
View more21 May 26
Uploaded Memo for Draft RFP and timeline updates.
11 May 26
Uploaded the block 45 Electrical Loads Analysis
06 May 26
Updated and attached the Q&A document with recent questions from Industry and responses from the Government
Removed and replaced the KC-135 CCR Baseline Configuration pdf.
05 May 26
Added KC-135 CCR Baseline Configuration to Bidder's Library
Added TO 00-5-16 to Bidder's Library
Added In Person Industry Day Measurements for KC-135 CCR Memo
28 Apr 26
Added In Person Industry Day Pictures KC-135 CCR Memo
23 April 2026
The following documents have been deleted due to non-applicability and/or being outdated.
The following document has been uploaded
------------------------------------------------------------------
15 April 2026
Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.
------------------------------------------------------------------
07 April 2026
NOTICE: AIRCRAFT TOUR ACCESS INFORMATION
The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:
• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.
• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.
Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.
Please plan accordingly to avoid delays.
The tour is scheduled to conclude by 4:00 p.m CST
------------------------------------------------------------------
03 April 2026
The Government is providing the following documents:
The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026
Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time
Information for the Aircraft Tour
Additional documents for the Bidder’s Library
See attachments:
“CUI_Industry Day 1 and 2 Q&A”
“CUI KC‑135 CCR Industry Day Responses”
“Tinker PDM Aircraft Tour for KC‑135 CCR”
------------------------------------------------------------------
27 March 2026
CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry
The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.
See attachment:
"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"
------------------------------------------------------------------
19 March 2026
Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.
Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.
17 March 2026
NOTICE REGARDING DOCUMENT ACCESS
Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.
------------------------------------------------------------------
16 March 2026
INDUSTRY DAY SCHEDULING:
The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes.
------------------------------------------------------------------
10 March 2026
The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.
Specifically:
All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time.
See attachments:
"DRAFT Solicitation - FA810526RB001"
"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"
"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"
"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"
"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"
------------------------------------------------------------------
03 March 2026
The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.
See attachments:
"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"
"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"
------------------------------------------------------------------
27 February 2026
The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.
See attachments:
"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"
"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"
------------------------------------------------------------------
18 February 2026
Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available.
------------------------------------------------------------------
17 February 2026
Updated non-CUI schedule for Industry:
CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026.
Full RFP release is currently expected May 2026.
------------------------------------------------------------------
05 February 2026
Added document "(CUI) KC-135 SCG Final Oct 2022"
------------------------------------------------------------------
13 January 2026
CCR Response to Industry Questions
The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.
See attachments:
"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"
"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"
"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"
------------------------------------------------------------------
17 December 2025
CCR Virtual Industry Day -2 April 2025: Charts for Industry
The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.
See attachments:
"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"
"(CUI) CCR Industry Day"
------------------------------------------------------------------
5 December 2025
REQUEST FOR INFORMATION (RFI) 3
The Goverment is seeking industry input concerning contract type and standard compliance.
See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details.
------------------------------------------------------------------
21 November 2025
The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.
See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details.
------------------------------------------------------------------
19 November 2025
An update has been added for the Center Console Refresh Revision 2 effort.
See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details.
------------------------------------------------------------------
14 November 2025
The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.
See attachments:
"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"
"(CUI) DRAFT KC-135 CCR Revision 2 SRD"
------------------------------------------------------------------
29 September 2025
Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.
Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.
-------------------------------------------------------------------
26 September 2025
The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.
See attachments:
"(CUI) Draft SRD KC-135 CCR Memo Signed"
"(CUI) DRAFT KC-135 CCR SRD"
-------------------------------------------------------------------
28 August 2025
An update has been added for the Center Console Refresh Revision 2 effort.
See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details.
-------------------------------------------------------------------
8 August 2025
Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".
Updated PCO from Russell Watson to Brandi Shelden.
-------------------------------------------------------------------
18 July 2025
Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".
The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.
-------------------------------------------------------------------
15 July 2025
Partial Bidder's Library uploaded to give Industry access to data. Additional documents will be uploaded as they become available. No responses are requested at this time.
----------------------------------------------------------------------
2 July 2025
REQUEST FOR INFORMATION (RFI) 2
The Goverment is seeking additional information concerning incentives and CPIF type contract.
See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details.
------------------------------------------------------------------------
6 June 2025
Added additional Q&A from 2 April 2025 virtual Industry Day.
Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"
14 April 2025
Added Q&A from 2 April 2025 virtual Industry Day.
Added a PDF version of the Q&A due to issues with opening the Word version.
07 March 2025
KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS. This will include a presentation and Q&A session followed by one-on-one sessions.
One-on-One Session Schedule:
1000-1100
1100-1200
1300-1400
1400-1500
1500-1600
If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at [email protected] for meeting invite(s). Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.
All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.
The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.
------------------------------------------------------------------------------------------------
21 February 2025
Updated RFI to extend response date to 24 March 2025 from 3 March 2025.
REQUEST FOR INFORMATION (RFI)
This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).
See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details.
To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.
The Department of the Air Force, specifically the AFLCMC WKK office at Tinker Air Force Base, has issued a sources sought notice for the KC-135 Center Console Refresh (CCR) Revision 2 program. This requirement is classified under NAICS 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing, and PSC 1680, Miscellaneous Aircraft Accessories and Components. The primary objective is to update and refresh the center console systems for the KC-135 aircraft. The government has conducted several industry engagement activities, including virtual and in-person industry days and aircraft tours, to provide technical data such as electrical loads analysis, baseline configurations, and draft system requirements.
Administrative milestones for the acquisition include a response deadline of September 15, 2026, with a formal proposal due date for the draft solicitation currently identified as July 31, 2026. The place of performance is South Coffeyville, Oklahoma. The government has released 158 attachments to support industry research, including draft statements of work, system requirements documents, Excel pricing workbooks for prime and subcontractors, and various technical orders. Access to controlled documents requires an active DD2345 on file via the Joint Certification Program.
The procurement process is managed by the Primary Contracting Officer, Brandi Shelden, who is the sole authorized individual for clarifying requirements and accepting recommendations. Industry engagement has focused on market research regarding contract types, including Cost Plus Incentive Fee structures, and technical compliance standards. Future milestones indicated in the notice include the transition from draft materials to a full Request for Proposal release.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.