Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 31, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 31, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9126G25R0128 | LINK | Mar 31, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 31, 2025 |
Fort Johnson, LA Horizontal HUBZone Multiple Award Task Order Contract
Contact and place of performance
Demetrius Brooks
Not specified
Design-Build and Design-Bid-Build Horizontal Construction for Fort Johnson, LA by means of Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) HUBZone Set-Aside to support facilities construction and repair. Description Of Work: Activities required include a wide variety of Design-Build and/or Design-Bid-Build (DBB) construction activities, to include, but not limited to design...
View moreThe Department of the Army, specifically the W076 ENDIST FT WORTH office, is soliciting proposals for a Multiple Award Task Order Contract (MATOC) to support horizontal construction at Fort Johnson, Louisiana. This requirement is a HUBZone (HZC) set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction) and PSC Y1LB (CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS). The Indefinite Delivery Indefinite Quantity (IDIQ) contract carries an estimated maximum capacity of $20 million over a seven-year ordering period, with individual task orders not to exceed $10 million.
The scope of work encompasses a broad range of Design-Build and Design-Bid-Build activities for facility construction and repair. Primary tasks include the design, construction, repair, or alteration of parking lots, retaining walls, playgrounds, vehicle and pedestrian fences and gates, and irrigation systems. Additional requirements involve drainage improvements such as underground storm drains, grading projects, flood walls, lighting, and the construction of roads, bridges, airport runways, and taxiways using both concrete and asphalt.
Formal responses to solicitation W9126G25R0128 are due by April 30, 2025. This notice was published on March 31, 2025, and identifies Demetrius Brooks as the primary point of contact. While the solicitation lists no initial attachments, it establishes the framework for ongoing horizontal construction support at the Fort Johnson installation.