Name | Type | Posted | Actions |
|---|---|---|---|
https://www.neco.navy.mil/synopsis_file/N6247319R2802_Amendment_5_-_RFI_Answers.pdf | LINK | Apr 22, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_Amendment_4_-_RFI_Answers.pdf | LINK | Apr 19, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_Amendment_3_-_RFI_Answers.pdf | LINK | Apr 18, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_Amendment_2_-_RFI_Form_-_Stormwater_Synopsis.docx.pdf | LINK | Apr 17, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_Amendment_1_RFI_Form_-_Stormwater_Synopsis_.pdf | LINK | Apr 2, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_REV_1_SYNOPSIS_2019_Stormwater_Amendment_1.pdf | LINK | Apr 2, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_SYNOPSIS_2019_Stormwater.docx.pdf | LINK | Mar 21, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_ATTACHMENT_B.docx | LINK | Mar 21, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_ATTACHMENT_A.docx.pdf | LINK | Mar 21, 2019 | |
https://www.neco.navy.mil/synopsis_file/N6247319R2802_SF_330.pdf | LINK | Mar 21, 2019 |
C--Storm Water, Incidental Groundwater, Wastewater, and Potable Water Compliance and Management Services at Navy and Marine Corps Installations Area of Responsibilities
C--Storm Water, Incidental Groundwater, Wastewater, and Potable Water Compliance and Management Services at Navy and Marine Corps Installations Areas of Responsibilities
Contact and place of performance
Dawn Evans 619.532.2482 Dawn Evans [email protected] 619.532.2482 Christine Reyes [email protected]
Not specified
Amendment 5 - Provide final response to RFIs. RFI period is now closed.
The Naval Facilities Engineering Systems Command (NAVFACSYSCOM) Southwest, a component of the Department of the Navy, issued solicitation N6247319R2802 for engineering services. This requirement is classified under NAICS 541330 for Engineering Services and PSC C, which covers Architect and Engineering Services. The opportunity is designated as an SBA set-aside. Administrative oversight for this notice is managed by Dawn Evans and Christine Reyes at the San Diego office.
The recent update via Amendment 5 serves to provide final responses to Requests for Information (RFIs), and the RFI period is officially closed. Interested parties must submit their responses by the deadline of April 23, 2019. The solicitation documentation does not include any additional external attachments or exhibits at this time.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.