Name | Type | Posted | Actions |
|---|---|---|---|
Bid Opening - W912QR23B0011.pdf | Nov 27, 2023 | ||
W912QR23B0011 0004.pdf | Nov 24, 2023 | ||
W912QR23B0011 003_.pdf | Nov 15, 2023 | ||
W912QR23B0011 0002.pdf | Oct 31, 2023 | ||
W912QR23B0011 0001.pdf | Sep 20, 2023 | ||
https://dodprocurementtoolbox.com/ | LINK | Sep 16, 2023 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 16, 2023 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912QR23B0011 | LINK | Sep 16, 2023 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 16, 2023 |
Ohio River Dredging
Ohio River Dredging
Contact and place of performance
Andrew Fleming
Not specified
The contractor shall furnish the equipment, materials, manpower required, and perform the work in accordance with the terms of the contract. The work to be performed under this task order shall include mobilization of the dredge and attendant plant; the dredging of shoals found between Cairo, IL and Markland Lock and Dam along the navigation channel Ohio River miles 981-531, Upper Mississippi River (UMR) Miles 0 ? 12...
View moreThe Department of the Army, U.S. Army Corps of Engineers Louisville District, issued solicitation W912QR23B0011 for dredging services along the Ohio River and Upper Mississippi River. The scope of work involves furnishing equipment, materials, and manpower to dredge shoals between Cairo, Illinois, and the Markland Lock and Dam, covering Ohio River miles 531 to 981 and Upper Mississippi River miles 0 to 120. Operations include dredging navigation channels and lock and dam approach areas, proper placement of materials in designated disposal locations, mobilization, travel between sites, and demobilization.
This requirement is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC M1KF, Operation of Dredging Facilities. The contract is a Firm Fixed Price Single Award Task Order Contract (SATOC) Indefinite Delivery, Indefinite Quantity (IDIQ). While the procurement is full and open, it includes a HZC (HUBZone) 10% price evaluation preference. Award will be based on the lowest reasonable and realistic evaluated price, determined by a price breakout schedule of all line items. All large business participants must submit a subcontracting plan.
The response deadline for this solicitation was November 24, 2023, following an initial bid due date of November 2, 2023. Project administration is managed by Andrew Fleming, and payments are processed via Electronic Funds Transfer. The solicitation record includes five attachments posted between September and November 2023, including four amendments and a bid opening document. All work under this contract is performed on a task order basis at specified river locations.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.