Name | Type | Posted | Actions |
|---|---|---|---|
Combined synopsis rev1.pdf | Apr 13, 2026 | ||
Combined synopsis.docx | DOCX | Mar 23, 2026 | |
Attachment 4 E-Invoicing Instructions.pdf | Mar 23, 2026 | ||
Attachment 3 Vendor pricing sheetTD208.xlsx | XLSX | Mar 23, 2026 | |
Attachment 2 TD208.Government Furnished Equipment List.pdf | Mar 23, 2026 | ||
Attachment 1 Statement of work.pdf | Mar 23, 2026 |
TD-208 Pusher Tug FY26 Dry Docking
Contact and place of performance
Mr. Cory Lynch
Norfolk, VA
USA
The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). Barring any weather related or unforeseeable delays, MARAD intends for the patrol boat to be delivered and tendered to the contractor’s facility within three working days of notice to proceed. MARAD will deliver the TD208 to the contractor’s faci...
View moreThe Maritime Administration (MARAD) is issuing this combined synopsis/solicitation for the dry-docking and repair of the TD-208 Pusher Tug. Classified under NAICS 336611 for Ship Building and Repairing and PSC J020 for maintenance, repair, and rebuilding of ship and marine equipment, this procurement is designated as an SBA Small Business Administration set-aside. The government intends to deliver the vessel to the contractor’s facility within three working days of the notice to proceed, provided there are no weather-related or unforeseen delays. The required place of performance is the Hampton Roads area of Virginia, including the James River, all branches of the Elizabeth River, York River, Mobjack Bay, and their tributaries.
The project schedule includes a 45-day period of performance for the dry-docking once delivery and tender are complete. During the production phase, a MARAD representative will be on-site at the contractor's facility to oversee the work. Upon completion and acceptance of all services, the government will resume custody and take re-delivery of the vessel at the contractor's location.
Responses to solicitation 6933A226Q000005 are due by April 30, 2026. The contract file includes six attachments, such as the statement of work, government-furnished equipment list, vendor pricing sheet, and e-invoicing instructions. Mr. Cory Lynch serves as the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.