NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
Contact and place of performance
Cameron Stokes
90277
The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harbors...
View moreThe Department of the Army, Los Angeles District, is seeking bids for repairs to the north breakwater at King Harbor in Redondo Beach, California. This project involves restoring a shore-connected, rubble-mound breakwater to its design elevations and slopes by resetting existing armor stone and placing approximately 8,000 tons of new 14-ton median-sized armor stone. Work includes repairing an eight-foot-wide armor stone bench located at an elevation of +10.0 feet MLLW on the harborside of the structure. The estimated magnitude of the project is between $5,000,000 and $10,000,000, with an anticipated performance period of 210 calendar days.
This procurement is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z2KZ, Repair or Alteration of Other Conservation and Development Facilities. The acquisition is an unrestricted sealed bid conducted under FAR Part 14, and large business offerors are required to submit a subcontracting plan for any award exceeding $1,500,000. Administrative updates have established a revised solicitation issue date of approximately June 27, 2025, with a response deadline of July 29, 2025.
Solicitation W912PL25B0004 will be managed through the Procurement Integrated Enterprise Environment (PIEE) suite. All official updates and amendments, including those for administrative timeline adjustments, are tracked via SF-30 forms. Cameron Stokes serves as the primary point of contact for this requirement, which currently contains zero attachments. All bids must be submitted electronically through the PIEE solicitation module according to the provided instructions.