NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
Contact and place of performance
Cameron Stokes
90277
The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harbors...
View moreThe Department of the Army, Los Angeles District, is issuing this pre-solicitation notice for the repair of a shore-connected, rubble-mound breakwater at King Harbor in Redondo Beach, California. The scope of work involves resetting existing armor stone and furnishing approximately 8,000 tons of new armor stone with a median stone size of 14 tons. Repairs will also address an eight-foot-wide armor stone bench on the harborside of the structure to restore design elevations and slopes in damaged areas.
This project is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z2KZ, Repair or Alteration of Other Conservation and Development Facilities. The acquisition will be conducted as an unrestricted sealed bid under FAR Part 14 with an estimated contract duration of 210 calendar days. The government estimates the project magnitude to be between $5,000,000 and $10,000,000. Large business offerors are required to submit a subcontracting plan if the award amount exceeds $1,500,000.
Under solicitation number W912PL25B0004, the government intends to issue the solicitation on or about June 27, 2025. Bids must be submitted through the Procurement Integrated Enterprise Environment (PIEE) by the response deadline of July 29, 2025. Cameron Stokes is the designated point of contact for this requirement, which currently includes zero attachments.