Name | Type | Posted | Actions |
|---|---|---|---|
Statement of Work dated 201210.pdf | Dec 16, 2020 | ||
Statement of Work N00253-20-R0005-0002.pdf | Dec 16, 2020 | ||
SF-30 N0025320R00050002.pdf | Dec 16, 2020 | ||
QUESTIONS ANSWERS N00253-20-R-00050002.pdf | Dec 16, 2020 | ||
SF-30 N0025320R005_Amendment_0001.pdf | Dec 2, 2020 | ||
QUESTIONS ANSWERS REGARDING RFP N00253-20-R-0005_V1.pdf | Dec 1, 2020 | ||
A005 Product Engineering Design Data and Associated Lists.pdf | Nov 6, 2020 | ||
Attachment 9 Cost Summary Table.xlsx | XLSX | Nov 6, 2020 | |
A019 Specification Requirement Verification Matrix.pdf | Nov 6, 2020 | ||
Attachment 8 ADC MK2 GFI.pdf | Nov 6, 2020 | ||
Attcachment 5 PMS 415 UDWS IUID-10-069.pdf | Nov 6, 2020 | ||
Attachment 1 Statement of Work.pdf | Nov 6, 2020 | ||
N0025320R0005.pdf | Nov 6, 2020 | ||
A010 Systems Engineering Management Plan.pdf | Nov 6, 2020 | ||
A022 Specification Change Notice.pdf | Nov 6, 2020 | ||
A001 Test and Evaluation Program Plan.pdf | Nov 6, 2020 | ||
B017 Integrated Program Management Data and Analysis Report.pdf | Nov 6, 2020 | ||
B005 Program Protection Implementation Plan.pdf | Nov 6, 2020 | ||
B006 Quality Deficiency Report.pdf | Nov 6, 2020 | ||
B004 System Safety Program Plan.pdf | Nov 6, 2020 | ||
A005 Product Engineering Design Data and Associated Lists (2).pdf | Nov 6, 2020 | ||
A008 Failure Summary and Analysis Report Signed.pdf | Nov 6, 2020 | ||
A007 Reliability and Maintainability Predictions Report.pdf | Nov 6, 2020 | ||
A009 Explosive Hazard Classification Data Report.pdf | Nov 6, 2020 | ||
A007 Reliability and Maintainability Predictions Report (2).pdf | Nov 6, 2020 | ||
A006 Configuration Audit Plan.pdf | Nov 6, 2020 | ||
A021 Contractor Configuration Management Plan.pdf | Nov 6, 2020 | ||
B007 Contract Work Breakdown Structure.pdf | Nov 6, 2020 | ||
B012 Programmatic Environmental Health and Safety Evaluation Plan.pdf | Nov 6, 2020 | ||
B015 Hazardous Materials Management Program Report.pdf | Nov 6, 2020 | ||
B011 Quality Program Plan.pdf | Nov 6, 2020 | ||
B012 Programmatic Environmental Health and Safety Evaluation Plan (2).pdf | Nov 6, 2020 | ||
B014 Program Management Plan.pdf | Nov 6, 2020 | ||
B017 Integrated Program Management Data and Analysis Report (2).pdf | Nov 6, 2020 | ||
B018 Configuration Status Accounting Information.pdf | Nov 6, 2020 | ||
B003 Conference Minutes.pdf | Nov 6, 2020 | ||
B002 Conference Agenda.pdf | Nov 6, 2020 | ||
Attachment 6 OPSEC Guide for Defense Contractors.pdf | Nov 6, 2020 | ||
B001 Contractors Progress and Status Report.pdf | Nov 6, 2020 | ||
C004 Bill of Materials for Logistics and Supply Chain Risk Management (2).pdf | Nov 6, 2020 | ||
C003 Item Unique Identification Marking and Verification Report (2).pdf | Nov 6, 2020 | ||
Attachment 3 PMS415 UDWS CMP-08-030.pdf | Nov 6, 2020 | ||
Attachment 7 Small Business Participation.docx | DOCX | Nov 6, 2020 | |
Attachment 11 DD254.pdf | Nov 6, 2020 | ||
C004 Bill of Materials for Logistics and Supply Chain Risk Management.pdf | Nov 6, 2020 | ||
C002 Ammunition Data Card.pdf | Nov 6, 2020 | ||
C003 Item Unique Identification Marking and Verification Report.pdf | Nov 6, 2020 | ||
A002 Test Procedure.pdf | Nov 6, 2020 | ||
A003 Test Inspection Report.pdf | Nov 6, 2020 | ||
A004 Engineering Change Proposal.pdf | Nov 6, 2020 | ||
A005 MIL-STD-31000B TDP Option Selection Worksheet.pdf | Nov 6, 2020 |
ADC MK2
ADC MK2
Contact and place of performance
Erin Malinski
Keyport, WA
USA
Current procurement requirements for the ADC MK 2 are designed for the United States Navy (USN) Submarine and Surface Fleet. The USN Fleet has a minimum sustainment inventory to support the Fleet and as such PMS 415 closely monitors Naval Supply Systems Command (NAVSUP) inventory requirements to adjust the acquisition of the appropriate quantities. This procurement action is based on the existing product specificatio...
View moreThe Naval Undersea Warfare Center, under the Department of the Navy, is conducting a procurement for ADC MK 2 devices to support the sustainment requirements of the United States Navy Submarine and Surface Fleet. As a legacy ACAT III, Post Milestone C program, the ADC MK 2 continues to be procured to bridge inventory needs following delays in the implementation of the ADC MK 5. Production requirements are driven by current product specifications, fleet inventory sustainment levels, and projected Foreign Military Sales demands. Current schedule estimates project the phase-out of these devices to begin around fiscal year 2026.
Beyond the production of hardware, the requirement includes incidental services such as non-recurring engineering, special analysis, trade-off and ad-hoc studies, and software analyses. The selected provider will also perform hardware repair, refurbishment, and modification to support government in-water testing, as well as the implementation of improvements to delivered equipment. These engineering services will be further defined through the issuance of Technical Instructions. Performance is centered in Keyport, Washington, under solicitation number N0025320R0005.
This opportunity is classified under NAICS 334511, Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing, and PSC 5865, Electronic Countermeasures, Counter-Countermeasures and Quick Reaction Capability Equipment. Responses are due by December 30, 2020. The solicitation record includes 51 attachments, featuring multiple versions of the Statement of Work, several amendments, and formal question-and-answer documents. Erin Malinski serves as the primary point of contact for this procurement action.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.