Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 28, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 28, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 28, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=SP330026Q0104¬iceType=CombinedSynopsisSolicitation | LINK | Apr 28, 2026 |
walk-in cooler/freezer system
Contact and place of performance
Mogen Gilson
17070
Amendment 0001 posted 5-26-2026, Provide all necessary engineering, labor, material and equipment to replace an existing walk-in cooler/freezer system for food storage in Building 79 at the Defense Distribution Center Susquehanna.
The Defense Logistics Agency (DLA) Distribution issued this combined synopsis and solicitation, identified by solicitation number SP330026Q0104, to procure a replacement walk-in cooler/freezer system. The project involves providing all necessary engineering, labor, material, and equipment to replace an existing food storage system located in Building 79 at the Defense Distribution Center Susquehanna. This requirement is categorized under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z2GZ for Repair or Alteration of Other Warehouse Buildings.
This procurement is set aside for Women-Owned Small Businesses (WOSB). Responses to the solicitation are due by June 9, 2026. The notice includes one unnamed PDF attachment posted on April 28, 2026, and was most recently updated via Amendment 0001 on May 26, 2026. Mogen Gilson serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.