Name | Type | Posted | Actions |
|---|---|---|---|
J&A No. 19-16_Redacted.pdf | Dec 5, 2019 | ||
JA No. 19-15_Redacted.pdf | Nov 22, 2019 | ||
JA No. 19-14_Redacted.pdf | Nov 20, 2019 | ||
J&A_No._19-13_Redacted.pdf | Nov 7, 2019 | ||
https://www.neco.navy.mil/synopsis_file/N6247013D6019,%20-13D6020,%20-13D6021,%20-13D6022_JA_19-04_Final_Redacted.pdf | LINK | Dec 19, 2018 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 22, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 21, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 17, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 13, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Jul 24, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Jul 13, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Jun 28, 2012 |
Y--J and A for Increase in Capacity of Current NAVFAC Atlantic Global Contingency Construction (GCC) Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Contract (MAC)
Y--IDIQ MULTIPLE AWARD GLOBAL CONTINGENCY CONSTRUCTION CONTRACT NAVFAC AREA OF RESPONSIBILITY AND WORLDWIDE
Contact and place of performance
Amber Forehand-Hughes
Not specified
Justification andApproval for Increase in Capacity of Current NAVFAC Atlantic Global Contingency Construction (GCC) Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Contract (MAC)
The Naval Facilities Engineering Systems Command (NAVFACSYSCOM) Atlantic issued this solicitation under notice N6247012R5010 to authorize a Justification and Approval (J&A) for increasing the capacity of the existing Global Contingency Construction (GCC) Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Contract (MAC). The contract supports construction requirements under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1JZ for Construction of Miscellaneous Buildings.
The procurement documentation consists of four redacted J&A attachments posted between November 7, 2019, and December 5, 2019. While the initial notice was published on April 24, 2012, with a response deadline of June 23, 2013, the subsequent updates address the administrative and legal requirements for expanding the financial or performance capacity of the current GCC MAC vehicle managed by the Department of the Navy. Amber Forehand-Hughes serves as the primary point of contact for this action.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.