Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 31, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 31, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 31, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912ES26QA030¬iceType=AwardNotice | LINK | Mar 31, 2026 |
Office Repairs for Hastings, MN
Contact and place of performance
Justin Rose
55033
The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a �? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier,...
View moreThe Department of the Army, specifically the St. Paul District of the Corps of Engineers, issued this award notice under solicitation W912ES26QA030 for repairs to the Hastings Resident Office building at Lock and Dam 2 in Hastings, Minnesota. This requirement addresses flood damage resulting from a frozen and burst copper water pipe. The project is classified under NAICS 238310 Drywall and Insulation Contractors and PSC Z2AA REPAIR OR ALTERATION OF OFFICE BUILDINGS. This procurement was designated as an SBA Small Business Administration set-aside.
The contractor is responsible for removing and replacing all damaged materials, including wall base molding, drywall, wall and ceiling insulation, water vapor barriers, bathroom wall tiles, carpet sections, ceiling tiles, and LED light panels. All replacement materials must match the existing undamaged materials or receive approval from the Contracting Officer. The scope also encompasses repairing the burst water pipe, reconnecting kitchenette plumbing and the hot water heater, painting new sheetrock and damaged areas, and remounting electrical conduit and fire alarm components.
Additional technical requirements include testing the fire alarm system for functionality, remounting fire extinguishers, steam cleaning carpets, and applying an epoxy floor with a non-slip grip in the server room. The contractor must also conduct air sampling for mold testing both before and after the repairs are completed. This award notice was published on March 31, 2026, by point of contact Justin Rose and includes one unnamed PDF attachment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.