Name | Type | Posted | Actions |
|---|---|---|---|
ISO194-22 AMD01 PG 1-8.pdf | Sep 29, 2022 | ||
SITE VISIT SIGN IN SHEET CONTINUED.pdf | Sep 22, 2022 | ||
SITE VISIT SIGN IN SHEET.pdf | Sep 19, 2022 | ||
202 Concept Drawings - Basement - VR5.pdf | Sep 2, 2022 | ||
202 Concept Drawings - 2nd Floor - VR4.pdf | Sep 2, 2022 | ||
202 Concept Drawings - 1st Floor - VR4.pdf | Sep 2, 2022 | ||
ISO194-22.pdf | Sep 2, 2022 | ||
FORM SF-25 PERFORMANCE BOND.pdf | Sep 2, 2022 | ||
FORM SF-24 BID BOND.pdf | Sep 2, 2022 | ||
FORMSF-25A PAYMENT BOND.pdf | Sep 2, 2022 | ||
ACH Vendor Enrollment Form 2022.pdf | Sep 2, 2022 | ||
PAST PERFORMANCE.pdf | Sep 2, 2022 |
Defense Acquisition University, Building 202,Renovation Project-Design Scope, Fort Belvoir, Virginia
Contact and place of performance
Jason Morgan
Fort Belvoir, VA 22060
USA
Provide a full renovation design and construction of DAU building 202 to include general meeting areas, executive offices, remote video conferencing suites, and open collaborative spaces that will support a healthier open air environment. The design shall also include secured communication spaces that are designed with an emphasis on efficiency in order to secure/store sensitive materials, along with restrooms, and a...
View moreThe Federal Prison System Bureau of Prisons, through its CO Business Office, is soliciting for the renovation design and construction of Building 202 at the Defense Acquisition University located in Fort Belvoir, Virginia. This solicitation, identified as ISO194-22, is designated as an SBA Small Business Administration set-aside. The project is classified under NAICS 541310 Architectural Services and PSC C1CA ARCHITECT AND ENGINEERING- CONSTRUCTION: SCHOOLS. Proposals are due by the response deadline of October 14, 2022, and must include a signed copy of the project amendment.
The scope of work requires a full renovation design and construction to establish general meeting areas, executive offices, remote video conferencing suites, and open collaborative spaces. The design incorporates secured communication spaces for storing sensitive materials, as well as restrooms and a breakroom. Technical requirements include mechanical system replacement featuring Johnson Control METESYS BAS, dehumidification, and ultraviolet lighting, alongside electrical upgrades and telecommunications system improvements.
The project also involves interior and exterior renovations such as adding elevator access, repairing doors and windows, and installing new carpet and paint. Exterior work includes replacing window wells and increasing drainage capabilities via downspouts. The solicitation includes 12 attachments, featuring floor-specific concept drawings and site visit documentation. Jason Morgan is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.