180th FW Lift Station Repair
The 180th Fighter Wing (OHANG) is repairing main lift station #3 in Swanton, Ohio. The project requires replacing a failed submersible pump and soft starter to restore the facility's wastewater infrastructure. This is a 100% small business set-aside under NAICS code 237110, with quotes due by June 8, 2026. The scope is limited to brand-name equipment to ensure compatibility with existing systems, specifically a Gorman-Rupp SF Series submersible pump (Model SFV4D) and an Allen-Bradley soft starter compatible with the SMC Flex model. The work includes removing and disposing of old components, NEC-compliant electrical wiring, system start-up, and testing. The period of performance is 90 calendar days from the contract award. Technical requirements are detailed in the Performance Work Statement, Brand Name Justification, and Wage Determination for Fulton, Lucas, and Wood counties. A Q&A document confirms that the government will not provide additional drawings or nameplate data, as the project is a direct like-for-like replacement. The project requires specific brand-name components to integrate with the existing wet well and control panels, including a Gorman-Rupp pump and Allen-Bradley soft starter. Procurement and installation of brand-name components to restore wastewater infrastructure.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
MSgt Scott Hartzell
Swanton, OH 43558
USA
DESCRIPTION: The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS). SCOPE OF WORK: The required services include, but are not lim...
View moreIntegration & Testing: Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration.
Deliverables: Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals.
PERIOD OF PERFORMANCE:
All work must be completed within 90 calendar days after the date of contract award.
CONTRACTOR RESPONSIBILITES:
In accordance with the PWS and federal labor laws, the contractor is responsible for:
Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category.
Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals.
Testing: Conducting full operational testing and start-up to verify system restoration.
Documentation: Ensuring as-built drawings are provided upon project completion.
*See Attchments