Name | Type | Posted | Actions |
|---|---|---|---|
Exhibit G -PUR-466_Proposal Certifications_r5_10.14.25 (5).pdf | Jun 1, 2026 | ||
Exhibit F - SARC_Subcontractor Annual RepsCerts Rev 7 (1).pdf | Jun 1, 2026 | ||
Exhibit E - FL-55 (Rev. 6-23) 14.0 - Exhibit III-G.pdf | Jun 1, 2026 | ||
Exhibit D- FFDG General Terms and Conditions for Supplies (08.2025).pdf | Jun 1, 2026 | ||
Exhibit C - Price Proposal Form.pdf | Jun 1, 2026 | ||
Exhibit A - ED0044582-A- ORBUMP Coil Assembly Fermilab SOW...pdf | Jun 1, 2026 | ||
RFP 378229-RK.pdf | Jun 1, 2026 |
Fabrication of PIP-II ORBUMP MAGNET COIL ASSEMBLY
The Department of Energy, through Fermi National Accelerator Laboratory (Fermilab) and Fermi Forward Discovery Group, LLC (FFDG), is seeking proposals for the fabrication and delivery of PIP-II ORBUMP Magnet Coil Assemblies. This work supports the Proton Improvement Plan II (PIP-II) project, an upgrade to Fermilab’s accelerator complex for the international Deep Underground Neutrino Experiment. The scope includes manufacturing precision copper assemblies—one prototype and seven production units—designed for high-energy neutrino beam applications. This is a best-value trade-off procurement under NAICS code 332710. Work must follow a detailed Statement of Work (SOW) covering brazing, machining, and factory acceptance testing. Proposals are due June 18, 2026, via email. Performance will take place in Illinois, with final delivery to Batavia. The solicitation includes seven exhibits (A through G) defining technical specs, pricing, terms, and mandatory certifications. Requirements include a 34-week delivery schedule for the prototype and specific corporate experience in precision electromagnet fabrication. Fermilab, managed by FFDG for the Department of Energy, is procuring PIP-II ORBUMP Magnet Coil Assemblies. This is part of the Proton Improvement Plan II (PIP-II) to upgrade the accelerator complex for the Deep Underground Neutrino Experiment (DUNE). The work involves manufacturing precision copper assemblies to strict technical specifications. Fermilab requires the fabrication, quality control, and delivery of PIP-II ORBUMP Magnet Coil Assemblies. This build-to-print project supports the Proton Improvement Plan II upgrade and includes manufacturing components, designing and building a specialized brazing fixture, vacuum oven brazing, and post-braze machining.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Richard Konan
IL 60510
USA
Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under a prime contract with the U.S. Department of Energy (DOE), is seeking to subcontract for work aligned with its mission objectives. The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s accelerator complex to enable the world’s most intense high-e...
View more