Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 18, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 18, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 18, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BV26QA048¬iceType=CombinedSynopsisSolicitation | LINK | Mar 18, 2026 |
NAVIGATION ? ROBERT S. KERR MARINE TERMINAL ? INSPECTION AND CERTIFICATION OF FIRE SUPPRESSION SYSTEM
The Department of the Army, through the Tulsa District Corps of Engineers, has issued solicitation W912BV26QA048 for the inspection and certification of fire suppression systems at the Robert S. Kerr Marine Terminal. The scope of work includes the inspection, testing, and certification of fire extinguishers and CO2 units, as well as the fixed fire control panels and CO2 systems on the M/V Mister Pat, the Ozark, and a crane barge. This requirement is classified under NAICS 238210, Electrical Contractors and Other Wiring Installation Contractors, and PSC S202, HOUSEKEEPING- FIRE PROTECTION.
This procurement is designated as an SBA SBA set-aside. Responses are due by April 20, 2026, and Tyler Hastings serves as the primary point of contact. Supporting documentation includes one unnamed PDF attachment posted on March 18, 2026, alongside the original notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Tyler Hastings
Not specified
Inspect, test, and certify the fire extinguishers, CO2 units, and the fixed fire control panel and CO2 system on the M/V Mister Pat, Ozark, and Crane Barge.