Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jan 21, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jan 21, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jan 21, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U2475¬iceType=CombinedSynopsisSolicitation | LINK | Jan 21, 2026 |
DROP STATION
Contact and place of performance
David Fortune
74501
Update 0003 is for Extending the due date Southern Systems Industrial Conveyors Mark No. 12402-WA96-1.5.7Loader Drop Rail Section with Stop Assembly The loader drop rail section with stop assembly includes the rail transfer section to bridge the monorail gap, position locking hardware and controls, lift arm connection and engagement, and the pushout connection to fully utilize all aspects of the system. This item is...
View moreThe Department of the Army, MICC-FT Drum, issued combined synopsis/solicitation W911S226U2475 for the acquisition of a Southern Systems Industrial Conveyors Mark No. 12402-WA96-1.5.7 loader drop rail section with stop assembly. This procurement is a SBA Small Business Administration set-aside classified under NAICS 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing and PSC 3910 CONVEYORS. Responses are due by February 25, 2026, and David Fortune is the designated point of contact for this requirement.
The required equipment must integrate seamlessly with an existing monorail system derived from Southern Systems Industrial Conveyors job number M-12-402-E. The assembly includes a rail transfer section to bridge monorail gaps, position locking hardware and controls, lift arm connection and engagement, and a pushout connection to enable full system utilization. Technical specifications include pneumatic tubing and fittings, a 2,000-lb load rating with a standard factor of safety, and a trolley type and wheel profile compatible with existing transition points to ensure seamless movement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.