Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 31, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 31, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 31, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226RA004¬iceType=CombinedSynopsisSolicitation | LINK | Mar 31, 2026 |
The Radford Army Ammunition Plant (RFAAP) Acid Farm Storage Tanks
Contact and place of performance
Lyndsie Hall
24141
This is an A-E Synopsis in accordance with FAR 36.102. The Mission and Installation Contracting Command - Fort Drum is procuring Architect-Engineer (A-E) Design Services for the Acid Farm storage tanks at the Radford Army Ammunition Plant (RFAAP). This procurement is conducted under the Brooks Architect-Engineer Act (40 U.S.C Section 1102) and Far subpart 36.102, which require that A-E contracts be negotiated on the...
View moreThe Mission and Installation Contracting Command - Fort Drum, under the Department of the Army, is procuring Architect-Engineer (A-E) design services for the Acid Farm storage tanks located at the Radford Army Ammunition Plant. This procurement is conducted in accordance with the Brooks Architect-Engineer Act and FAR subpart 36.102, which prioritize negotiations based on demonstrated competence and professional qualifications. The selected firm will design a modernized Acid Tank Farm to support capacity requirements for several facilities, including the modernized Nitric Acid Concentrator/Sulfuric Acid Concentrator, the Modernized Nitrocellulose production facility, and the Legacy Nitroglycerin Production Facility.
This solicitation is identified as W911S226RA004 and is categorized under NAICS 541330 for Engineering Services and PSC C1EA for Architect and Engineering- Construction: Ammunition Facilities. The opportunity is designated as an SBA set-aside. Interested parties must submit responses by the deadline of April 30, 2026.
Project documentation includes a single PDF attachment released on March 31, 2026. Lyndsie Hall serves as the point of contact for this requirement. This synopsis was published and last updated on March 31, 2026, by the MICC-Fort Drum contracting office.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.