Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 01 to RFP 378957.pdf | Jun 5, 2026 | ||
Exhibit O_ Payment BondFL-42.pdf | May 5, 2026 | ||
Exhibit N_Bid Bond FL-41.pdf | May 5, 2026 | ||
Exhibit M_PUR-466_Proposal Certifications_r5_10.14.25.pdf | May 5, 2026 | ||
Exhibit L_SF1413-23a (1).pdf | May 5, 2026 | ||
Exhibit K_ Price Proposal Form.pdf | May 5, 2026 | ||
Exhibit J_Fermilab Subcontractor Safety Information Questionnaire.pdf | May 5, 2026 | ||
Exhibit L_SARC_Subcontractor Annual RepsCerts Rev 8.pdf | May 5, 2026 | ||
Exhibit H_2025 Construction Insurance Requirements.pdf | May 5, 2026 | ||
Exhibit P_ DBA WD IL2026008 Mod 1_1.9.26.pdf | May 5, 2026 | ||
Exhibit F_014100 Quality Requirements - (1 QC Plan Not Required)-1.pdf | May 5, 2026 | ||
Exhibit E_013300 Submittals FermiForward.pdf | May 5, 2026 | ||
Exhibit D_013100_ESH_Requirements_04-2025 FFDG.pdf | May 5, 2026 | ||
Exhibit C_010010_General_Requirement_2025 FFDG.pdf | May 5, 2026 | ||
Exhibit B_Conduit path_ICB-A Angstrom E-Beam ECR Vacuum.pdf | May 5, 2026 | ||
Exhibit A_SOW - ICB -A Angstrom E-Beam ECR Vacurm.pdf | May 5, 2026 | ||
1.0 RFP Instructions to Offerors_378957.pdf | May 5, 2026 | ||
Exhibit G_FFDG General Terms and Conditions for Construction (08.2025).pdf | May 5, 2026 |
Fermilab-ICB-A Angstrom E-Beam ECR Vacuum Electrical Feed-DG
Contact and place of performance
Dasia Guthrie
Not specified
The Subcontractor shall perform all work as described in the Statement of Work for the ICB-A Angstrom E-Beam ECR Vacuum included as Exhibit A and drawing included as Exhibit B. All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.
The Department of Energy, through its contractor Fermilab, is soliciting proposals for the ICB-A Angstrom E-Beam ECR Vacuum Electrical Feed project under solicitation number 378957-DG. The subcontractor is responsible for all work detailed in the provided Statement of Work and drawings, including the construction of the project and the provision of all necessary transportation, overhead, bonding, insurance, and supervision. The scope further requires the subcontractor to maintain safety and quality control oversight throughout the performance period.
This requirement is classified under NAICS code 238210 for Electrical Contractors and Other Wiring Installation Contractors and PSC 5970 for Electrical Insulators and Insulating Materials. The procurement is designated as an SBA set-aside. Interested parties must submit their responses by the deadline of June 12, 2026. Dasia Guthrie serves as the primary point of contact for this solicitation.
The solicitation includes 18 attachments, such as Amendment 01, price proposal forms, proposal certifications, and various exhibits related to bid and payment bonds. Performance requirements are governed by the detailed specifications in the exhibits, ensuring all vacuum and electrical feed components meet the technical standards established for the ICB-A Angstrom E-Beam ECR system.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.