Name | Type | Posted | Actions |
|---|---|---|---|
36C25026Q0034 0005.pdf | May 28, 2026 | ||
36C25026Q0034 0004.pdf | Dec 11, 2025 | ||
539-25-505 - CD Set - Revision 1.pdf | Dec 11, 2025 | ||
REVISED STATEMENT OF BID ITEMS.pdf | Dec 11, 2025 | ||
36C25026Q0034 0003.pdf | Dec 10, 2025 | ||
36C25026Q0034 0002.pdf | Nov 25, 2025 | ||
36C25026Q0034 0001.pdf | Nov 4, 2025 | ||
Attachment V - vha directive 1192.01.pdf | Oct 31, 2025 | ||
Attachment VI - Specs.pdf | Oct 31, 2025 | ||
Attachment III - RFI.pdf | Oct 31, 2025 | ||
Attachment II - EMR.pdf | Oct 31, 2025 | ||
Attachment IV - Limitation on Subcontracting Cert.pdf | Oct 31, 2025 | ||
36C25026Q0034_1.pdf | Oct 31, 2025 | ||
Attachment I - DBA.pdf | Oct 31, 2025 | ||
Attachment VII - Construction Documents.pdf | Oct 31, 2025 |
539-25-505 Maintain Parking Garage Safety
539-25-505 Maintain Parking Garage Safety
The Department of Veterans Affairs has issued solicitation 36C25026Q0034 for the Maintain Parking Garage Safety project in Cincinnati, Ohio. This requirement is a Service-Disabled Veteran-Owned Small Business (SDVOSBC) set-aside under NAICS 238110, Poured Concrete Foundation and Structure Contractors, and PSC Z1DZ, Maintenance of Other Hospital Buildings. Responses for this solicitation are due by May 28, 2026.
The scope of work involves replacing waterproofing joint sealants throughout the parking garage and removing and patching concrete at slab joints where water intrusion has caused damage. To avoid conflicts with medical center operations, all work must be performed during weekends. The contractor is responsible for procuring and coordinating with a specific firm, THP LTD, to perform consulting services regarding the structural condition of the garage. This structural assessment includes reviewing floors, soffits, perimeter walls, facades, and stair towers to identify deterioration or water damage, along with conducting sounding surveys and chloride ion testing on each floor.
Contractors must comply with general industry standards for the concrete condition assessment of parking structures. Documentation for this opportunity includes 15 attachments, such as revised statements of bid items, revised CD sets, and various solicitation amendments. Samuel Galbreath serves as the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Samuel Galbreath
Cincinnati, OH 45220
USA
The “Maintain Parking Garage Safety” project will replace waterproofing joint sealants throughout the garage, as well as remove and patch concrete at the joints between slabs where water intrusion has caused damage. This work is to be performed over weekends to avoid conflicts with VA operations. The contractor will also procure and coordinate with a firm, THP LTD, qualified to perform consulting service...
View more