Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 21, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 21, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 21, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DS26BA017¬iceType=Presolicitation | LINK | May 21, 2026 |
Maintenance Dredging at Haverstraw Bay, NY
Contact and place of performance
Nicholas Emanuel
Not specified
The New York District (NAN) of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Hudson River Federal Navigation Project. The dredged material shall be transported to and placed at the federally approved Historic Area Remediation Site (HARS) located at the New York Bight Apex in the Atlantic Ocean. The proposed maintenance dredging will require the removal of approximately 200,0...
View moreThe U.S. Army Corps of Engineers New York District is seeking maintenance dredging services for the Hudson River Federal Navigation Project under solicitation number W912DS26BA017. The project involves the removal of approximately 200,000 cubic yards of critical shoals consisting primarily of silt and clay from the Federal Navigation Channel at Haverstraw Bay, New York. Dredging will occur between river miles 35 and 40 to a depth of -32 feet Mean Lower Low Water, with a one-foot allowable over-depth. All dredged material must be transported approximately 60 miles for placement at the Historic Area Remediation Site located at the New York Bight Apex in the Atlantic Ocean.
Classified under PSC Z1KF MAINTENANCE OF DREDGING FACILITIES, the work requires a mechanical dredge with a closed clamshell environmental bucket and may include the use of hopper barges and tugboats. The government will provide all necessary permits, though the contractor must comply with Water Quality Certification restrictions that prohibit in-water dredging work outside of the window between August 15 and October 31. This notice includes one PDF attachment posted on May 21, 2026, and Nicholas Emanuel serves as the primary point of contact.
The response deadline for this pre-solicitation is June 5, 2026. The government intends to release plans and specifications in June 2026, hold a bid opening in July 2026, and issue an award in August 2026. The contractor is required to begin work within five calendar days of the Notice to Proceed, which is anticipated on or about August 10, 2026. Liquidated damages for delays are set at $2,015.00 per calendar day until the work is accepted.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.