Name | Type | Posted | Actions |
|---|---|---|---|
HAFB Plating Shop 01MAY2026 Site Walk Attendee Roster.pdf | May 5, 2026 | ||
HAFB Plating Shop_01MAY2026 Solictation Site Walk Attendee Roster.pdf | May 4, 2026 | ||
HAFB Plating Shop Renovation_01MAY2026 Solicitation Site Walk Brief.pdf | May 4, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Apr 9, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9123826RA004¬iceType=SolicitationNotice | LINK | Apr 9, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 9, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 9, 2026 |
USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
USACE SPK Hill Air Force Base Plating Shop Renovation SATOC
Contact and place of performance
Melita Doyle
84041
1. GENERAL INFORMATIONThe U.S. Army Corps of Engineers, Sacramento District (USACE SPK), intends to solicit proposals for a Single Award Task Order Contract (SATOC) to support the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This notice is issued for planning and information purposes only and does not constitute a solicitation.The SATOC will be stru...
View moreThe U.S. Army Corps of Engineers (USACE), Sacramento District, intends to award a Single Award Task Order Contract (SATOC) for the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base, Utah. This requirement is categorized under NAICS 236210, Industrial Building Construction, and PSC Z2EZ, Repair or Alteration of Other Industrial Buildings. The project involves design-bid-build construction task orders focused on Buildings 505 and 507. Work includes the demolition and replacement of plating line tanks, installation of new electroplating and surface treatment process lines, and the construction of a 2,800-square-foot pre-engineered metal building. The scope also encompasses upgrades to mechanical, electrical, ventilation, and fire suppression systems, as well as structural modifications and utility improvements to support continuous mission operations.
The solicitation is issued as a full and open procurement with a response deadline of June 11, 2026. The resulting SATOC will have a five-year ordering period of 1,825 calendar days and a total contract capacity of approximately $114,000,000, though the overall magnitude of construction is estimated between $100,000,000 and $250,000,000. The contract will utilize four distinct phases executed through firm-fixed-price task orders ranging from $2,500 to $50,000,000 each. Evaluation will be based on best-value tradeoff procedures, considering factors such as past performance, technical and management approach, network analysis schedule, and a small business participation commitment document.
The procurement process is identified by solicitation number W9123826RA004 and is managed by point of contact Melita Doyle. To date, the solicitation includes four attachments: two site walk attendee rosters dated May 4 and May 5, 2026; a solicitation site walk brief; and one unnamed PDF document. Performance requires specialized experience in industrial process facility renovation and precision installation within active, hazardous material process environments. Pricing will be pre-priced at the base contract level for specific renovation phases, chemical addition systems, and contaminated soil disposal.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.