No attachments available.
Mississippi River Maintenance Dredging Activities
Contact and place of performance
Jason Crockett
New Orleans, LA 70118
USA
NOTICE OF INTENT TO SOLE SOURCE THIS ANNOUNCEMENT IS FOR INFORMATION PURPOSES ONLY USACE MVN intends to negotiate on a sole source basis with Pine Bluff Sand and Gravel Company (PBS&G) for the operation of the Mississippi River maintenance dredging activities. The work will consist of furnishing one fully crewed and equipped self-propelled dustpan hydraulic pipeline dredge and attendant plant for the removal and sati...
View moreThe U.S. Army Corps of Engineers, New Orleans District, issued this special notice of intent to negotiate a sole-source contract with Pine Bluff Sand and Gravel Company for maintenance dredging activities on the Mississippi River. This requirement is identified under solicitation number W912P823R0030 and is classified under NAICS 237990 Other Heavy and Civil Engineering Construction and PSC Y1KF CONSTRUCTION OF DREDGING FACILITIES. The agency intends to award the contract under the statutory authority of 10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1(a)(2), citing that only one responsible source can satisfy the government’s requirements.
The scope of work involves furnishing one fully crewed and equipped self-propelled dustpan hydraulic pipeline dredge and an attendant plant to remove and dispose of shoal material. The required plant includes a fuel barge, supply barge, landing barge, survey boat, a minimum of two tenders, and at least 1,000 feet of floating pontoon pipeline. Primary dredging operations are located between Mile 320 Above Head of Passes (AHP) near Black Hawk, Louisiana, and Mile 103 AHP in New Orleans. Secondary dredging regions extend from Mile 953.8 AHP in Cairo, Illinois, to Mile 320 AHP.
Although this announcement is for information purposes and not a formal request for proposals, the government will consider capability statements or quotations from responsible sources to determine if a competitive procurement is advantageous. Submissions must provide clear and convincing evidence of the respondent's ability to perform the required dredging services. All inquiries and responses must be submitted to Contract Specialist Jason Crockett by the deadline of 2:00 PM Central Standard Time on August 13, 2024.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.