Y--Weld Substation Stage 05
Contact and place of performance
Pratt, John W.
Not specified
NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted. The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The Weld Substatio...
View moreThe Department of Energy, Western Area Power Administration Rocky Mountain Region, has issued a pre-solicitation notice under solicitation number 89503226BWA000074 for the Weld Substation Stage 05 construction project. This requirement is a 100% small business set-aside categorized under NAICS 237130, Power and Communication Line and Related Structures Construction, and PSC Y1PZ, CONSTRUCTION OF OTHER NON-BUILDING FACILITIES. Located at the Weld Substation in Greeley, Colorado, the project aims to enhance electrical power reliability and safety by replacing the end-of-life KV1A transformer and resolving deteriorating conditions within the existing station service switchgear. The estimated magnitude of the construction is between $1 million and $5 million.
The scope of work involves providing all labor, materials, tools, and equipment necessary for the removal and installation of a 230/115-13.8-KV, 150MVA transformer and associated 230/115KV take-off structures. Contractor responsibilities include the installation of a new station service, removal of the existing service, and the installation of new KV2A and KV1A tertiary station service feeds. Additional tasks include constructing foundations, installing electrical equipment, replacing control building single-phase AC panels with 3-phase panels, and general site development. The anticipated period of performance is 700 calendar days following the Notice to Proceed, with the new transformer expected for delivery in 2027.
The solicitation will utilize FAR Part 14 sealed bidding procedures, with an expected issue date of June 9, 2026. Responses must be submitted through FedConnect by the July 15, 2026, deadline. All bids must comply with the Buy American Act, requiring bidders to identify any non-domestic materials included in their proposals. John W. Pratt is the designated point of contact for this requirement, which currently contains zero attachments.