Name | Type | Posted | Actions |
|---|---|---|---|
IFB - 12FPC326B0012 Combined Synopsis.pdf | May 20, 2026 | ||
Attachment 1 Specifications.pdf | May 19, 2026 | ||
Attachment 2 Tyler Dam Drawings.pdf | May 19, 2026 | ||
Attachment 3 - WD MA20250006 1-30-2026.pdf | May 19, 2026 | ||
Attachment 4 - WD MA20250008 1-2-2026.pdf | May 19, 2026 | ||
IFB - 12FPC326B0012 Combined Synopsis.pdf | May 19, 2026 |
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Contact and place of performance
Mark Domingo
MA 01752
USA
Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27ᵗʰ at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary ...
View moreThe Farm Production and Conservation Business Center has issued a combined synopsis/solicitation, identifier 12FPC326B0012, for the Tyler Dam Rehabilitation project in Worcester County, Massachusetts. This requirement is categorized under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Y1QA for Construction of Restoration of Real Property (Public or Private). The procurement is designated as an SBA SBA set-aside.
The project scope involves rehabilitating the existing dam to meet current safety and performance standards following engineering studies that identified inadequate auxiliary spillway capacity. Primary tasks include excavating the approach channel by 2.5 feet, installing a geosynthetic clay liner, raising embankment crests to a uniform elevation, and constructing a concrete crest wall at the Robin Hill Street intersection. Contractor responsibilities also include replacing concrete joint sealant in the auxiliary and principal spillways, replacing chain-link fencing, and removing trees within 20 feet of the right upstream embankment groin.
A site showing is scheduled for May 27, 2026, at the project location in Marlborough, Massachusetts. The response deadline for this solicitation is June 18, 2026, with Mark Domingo serving as the point of contact. Supporting documentation includes six attachments consisting of the solicitation, project specifications, engineering drawings, and two wage determinations.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.