Name | Type | Posted | Actions |
|---|---|---|---|
D1_8775870_Bob_Hall_Pier_7_5__PLATFORM_v15.pdf | Apr 13, 2026 | ||
D9_SHAKESPEARE_LIGHT_POLE_DOUBLE_ANEMOMETER_MASTHEAD__REV_C.pdf | Apr 13, 2026 | ||
D8_SADDLE_48_BINDER.pdf | Apr 13, 2026 | ||
D7_STANDARD_BUBBLER_ORIFICE__REV_A.pdf | Apr 13, 2026 | ||
D2_DMES_60X60X15__REV_D.pdf | Apr 13, 2026 | ||
D10_GEODETIC_LEVELLING_COLLAR_FOR_MICROWAVE_WATER_LEVEL_SENSOR__REV_D.pdf | Apr 13, 2026 | ||
D6_MET_3_BINDER.pdf | Apr 13, 2026 | ||
D5_11_Inch_Fixed_Arm_-_Straight_Flanges_v5.pdf | Apr 13, 2026 | ||
D4_DMES_SDME_SOLAR_RACK_ASSEMBLY_-_BINDER.pdf | Apr 13, 2026 | ||
D3_DMES_60X60X15_ASSEMBLY__REV_D.pdf | Apr 13, 2026 | ||
Contractor_Past_Performance_Reference_Sheet.pdf | Apr 13, 2026 | ||
Sol_1305M226Q0094.pdf | Apr 13, 2026 |
PLATFORM FABRICATION SERVICES FOR NOAA
Contact and place of performance
WALTON, MICHELLE
Not specified
FABRICATION SERVICES TO PRODUCE A 7.5‘PLATFORM, DUAL MAST ENCLOSURE STAND (DMES), SOLAR RACK, 11” FIXED ARM, MET SWING PLATE, STANDARD BUBBLER ORIFICE, SADDLE, SHAKESPEARE LIGHT POLE DOUBLE ANEMOMETER MASTHEAD AND A GEODETIC LEVELING COLLAR FOR THE NOAA NATIONAL OCEAN SERVICE. FABRICATION TIMELINE OF 60 DAYS PLEASE INCLUDE FABRICATION LEAD TIME ON OFFERS This is a combined synopsis/solicitation for commercial items p...
View moreThe National Oceanic and Atmospheric Administration (NOAA) issued solicitation 1305M226Q0094 as a combined synopsis/solicitation for commercial items. This acquisition is designated as a total small business set-aside under the SBA (SBA) program. It is classified under NAICS code 332710 for Machine Shops and PSC 3449 for Miscellaneous Secondary Metal Forming and Cutting Machines. Responses to this solicitation are due by April 22, 2026, and must include the vendor's contact information, CAGE code, and proposed fabrication lead time.
The National Ocean Service requires fabrication services for several specific components, including a 7.5-foot platform, a dual mast enclosure stand (DMES), a solar rack, an 11-inch fixed arm, and a met swing plate. Additional items in the scope of work include a standard bubbler orifice, a saddle, a Shakespeare light pole double anemometer masthead, and a geodetic leveling collar. Contractors are responsible for producing these items according to the 12 provided drawing sets, including all hardware specified in the documentation, and must fully assemble each item for shipment. The performance timeline for fabrication is 60 days.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.