Name | Type | Posted | Actions |
|---|---|---|---|
Attachment_0003__Wage_Determination.pdf | Jun 1, 2026 | ||
Attachment_0001__Specification.pdf | Jun 1, 2026 | ||
Attachment_0004__Price_Schedule.pdf | Jun 1, 2026 | ||
Attachment_0006__Bid_Bond.pdf | Jun 1, 2026 | ||
Attachment_0005__Past_Performance.docx | DOCX | Jun 1, 2026 | |
Attachment_0002__Drawings.pdf | Jun 1, 2026 | ||
Attachment_0007__Construction_Contract_Administration.docx | DOCX | Jun 1, 2026 | |
Sol_140P5126R0004.pdf | Jun 1, 2026 |
Rehabilitation of the Maintenance Complex Roofs, C
The National Park Service is seeking proposals for the rehabilitation of maintenance complex roofs at Chickamauga and Chattanooga National Military Park. The project scope includes asbestos-cement roofing abatement, sheathing replacement, and the repair or replacement of slate shingles across several units. This firm-fixed-price procurement is set under NAICS code 238160, Roofing Contractors, with an estimated value between $500,000 and $1,000,000. The performance period is 180 calendar days from the Notice to Proceed. Evaluation will follow a Lowest Price Technically Acceptable (LPTA) process, assessing price, technical approach, and past performance. Mandatory site visits are scheduled for June 9 and June 16, 2026, and final proposals are due by June 30, 2026. The solicitation package includes technical specifications, architectural drawings, Davis-Bacon wage determinations, and a price schedule covering two base items and eight options. The solicitation package includes the primary SF-1442 and seven attachments detailing technical, administrative, and financial requirements. These documents cover project specifications, architectural drawings, and a price schedule for base items and options. Mandatory forms include the Bid Bond and a Past Performance Questionnaire. The National Park Service requires the rehabilitation of maintenance complex roofs at Chickamauga and Chattanooga National Military Park in Fort Oglethorpe, Georgia. The work includes abating asbestos-cement roofing, replacing damaged wood sheathing, and installing new or salvaged slate shingles. Contractors must sound and salvage existing slate for reuse, repair gutters, and install new sub-roofing systems. This is a firm-fixed-price contract with a 180-day performance period.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Bard, Yanick
Not specified
EO 14398 - Rehabilitation of the Maintenance Complex Roofs, Chickamauga and Chattanooga National Military Park