Name | Type | Posted | Actions |
|---|---|---|---|
A5 PWS Film Processor Maintenance_FinalRev_Redacted.pdf | Sep 10, 2025 | ||
A5 PWS Film Processor Maintenance_Amended.pdf | Aug 25, 2025 | ||
C 04.0 Combined+Synopsis-Solicitation-Film Processor_Amended.pdf | Aug 25, 2025 | ||
C08.0 Questions submitted N4523A25Q1412.pdf | Aug 18, 2025 | ||
A05 PWS Film Processor Maintenance_Redacted.pdf | Aug 12, 2025 | ||
A05.0 Major Maint Checklist Processor_OperatingManual_Attachment Two.pdf | Aug 12, 2025 | ||
A11 WageDetermination_2015-5635_SanDiegoCA.pdf | Aug 12, 2025 | ||
C 04.0 Combined+Synopsis-Solicitation-Film Processor_final.pdf | Aug 12, 2025 | ||
A05.0 PSNS5090-132 Contractor Hazardous Material Inventory (CHMI)_Attachment One.pdf | Aug 12, 2025 | ||
A11 WageDetermination_2015-5525_KitsapWA.pdf | Aug 12, 2025 |
Preventative Maintenance and Calibration plan for GE Type 5203/300 Structurix M-Eco Radiography Film Processors for Puget Sound Naval Shipyard (Bremerton, WA) and Naval Air Station North Island (San Diego, CA)
Preventative Maintenance and Calibration plan for GE Type 5203/300 Structurix M-Eco Radiography Film Processors for Puget Sound Naval Shipyard (Bremerton, WA) and Naval Air Station North Island (San Diego, CA)
Contact and place of performance
Crystal McCarthy
Bremerton, WA
USA
***** AMENDED 9/10/25 Due to Changes in PWS. See Updated Revised PWS. Revisions corrected in Red Font ***** ****AMENDED 8/25/25 Due to Changes in PWS. See Revised PWS for changes**** *****AMENDED 8/18/25 TO ADD Q&A PDF DOCUMENT FOR QUESTIONS SUBMITTED DURING OPEN PERIOD***** Combined Synopsis Solicitation Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) Preventative and Co...
View moreCLIN 0001 Bi-Annual Maintenance at Puget Sound Naval Shipyard – Bremerton, WA
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform bi-annual preventative maintenance on two (2) GE Type 5203/300 Structurix M-Eco Radiography Film Processor as defined in the attached PWS. Equipment: S/N 1756 AID 4523A16500 and S/N 1763 AID 4523A17179
Quantity: 20
Unit of Measure: Job
Unit Price: __________________
Total Price: ___________________
Location: Puget Sound Naval Shipyard, Bremerton, WA
FOB: Destination
Fixed Price
CLIN 0002 Unscheduled Inspect and Repair at Puget Sound Naval Shipyard - Bremerton, WA
Onsite, unscheduled inspect and repair service calls at PSNS – Bremerton, WA
IAW section 5.3 of PWS.
Quantity: 10
Unit of Measure: Job
Unit Price: __________________
Total Price: ___________________
Location: Puget Sound Naval Shipyard, Bremerton, WA
FOB: Destination
Fixed Price
CLIN 0003 CLIN 0001 Bi-Annual Maintenance at Naval Air Station North Island (NASNI) – San Diego, CA
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform bi-annual preventative maintenance on one (1) GE Type 5203/300 Structurix M-Eco Radiography Film Processor as defined in the attached PWS. Equipment: S/N 1758 AID 4523A17182
Quantity: 10
Unit of Measure: Job
Unit Price: __________________
Total Price: ___________________
Location: Naval Air Station North Island, San Diego, CA
FOB: Destination
Fixed Price
CLIN 0004 Unscheduled Inspect and Repair at Naval Air Station North Island – San Diego, CA
Onsite, unscheduled inspect and repair service calls at NASNI – San Diego, CA
IAW section 5.3 of PWS.
Quantity: 5
Unit of Measure: Job
Unit Price: __________________
Total Price: ___________________
Location: Naval Air Station North Island, San Diego, CA FOB: Destination
Fixed Price
CLIN 0005 Follow-on Repairs
Follow-on repairs based on Open and Inspect results under CLIN0002 &/or CLIN0004 IAW section 5.3 of the PWS. THIS CLIN IS NOT PRICED AT THE TIME OF AWARD
Quantity: 5
Unit of Measure: Job
Unit Price: __________________
Total Price: ___________________
Location: Naval Air Station North Island, San Diego, CA FOB: Destination
Fixed Price
9. A full description of all requirements associated with this contract action are provided in a detailed Performance Work Statement (Attachment 1).
Special Qualifications (ref. PWS 1.9):
10. Delivery shall be FOB Destination. The delivery location information is provided in PWS.
11. Unless otherwise specified in the order, the supplier is responsible for the performance of all inspection requirements and quality control. The Contractor shall include delivery schedule information in their proposal.
12. Place of Performance: Puget Sound Naval Shipyard, 1400 Farragut Avenue, Bremerton, WA 98314, inside the Controlled Industrial Area and at Puget Sound Naval Detachment (N35620) Naval Air Station North Island (NASNI) Coronado BLDG 73 (Roe Street Access) San Diego, CA 92135.
13. Period of Performance: 09/01/2025 through 08/31/2030 or for a maximum 5 years from date of contract award.
14. Please submit your proposal, along with the rest of the solicitation requirements in the current solicitation, no later than 28 August 2025 by 03:00 PM Pacific Standard Time via email to Crystal McCarthy at [email protected], and Jacqueline Edgerton, [email protected]. Proposals submitted after solicitation closing will not be considered.
15. Solicitation questions shall be submitted electronically via email to Crystal McCarthy at [email protected], and Jacqueline Edgerton, [email protected] , no later than 26 August 2025, 12:00 PM Pacific Standard Time.
NOTE: Late offers will be handled in accordance with FAR Clause 52.212-1 Instructions to Offerors - Commercial Items. No facsimile submissions will be accepted. Proposals are due by 28 August 2025 by 03:00 PM Pacific Standard Time.
16. Point of Contact for small business questions or assistance is the Puget Sound Naval Shipyard and Intermediate Facility is Ashley Jackson (360) 979-3423, [email protected].
17. Vendors shall ensure the provision at FAR 52.212-3 including its Alternate I, Vendors Representations and Certifications—Commercial items (DEC 2022), are up to date in SAM.gov. To be eligible for the award, registration with the System for Award Management (SAM) must be current at the time of submitting proposals. This requirement is not waived. To register or apply please visit the SAM website at HYPERLINK “http://www.sam.gov/”. If you are not registered, you may request an application at (866) 606-8220 between the hours of 6 am – 8 pm (Eastern Time). The Contracting Officer will verify the Entity’s CAGE code prior to the award, so please ensure you include it in your cover letter. Failure to obtain SAM registration will result in submissions not being considered for the award.
Please provide the following information, with a copy of the provisions in accordance with FAR 52.212-3 including its Alternate I, Offeror Representation and Certifications-Commercial Items.
Name of Business
Entity:
Primary Address:
DUNS No.:
CAGE Code:
Federal Tax ID:
Name of Contact:
Phone:
Email Address:
18. Offerors are notified that initial proposals which are incomplete may be eliminated from further consideration for award. The contractor must meet all requirements of this Request for Quote. Award will be made to the proposal that is most advantageous to the Government in terms of meeting its requested delivery date and specifications, in accordance with 52.212-2, Evaluation – Commercial Items.
19. In accordance with 52.212-1 Instructions to Offerors – Commercial Products and Commercial Services Addendum Instructions and Submittal Requirements for Each Factor, Offerors shall provide the following information with the quote:
A. An official proposal with the RFP number, Company Name and Address, point of contact, and CAGE Code on company letterhead.
B. The CLIN pricing must be completed, and all attachments must be completed and submitted.
C. Include a statement specifying the extent of agreement with all terms, conditions and provisions included in the RFP. Proposals that take exception to the terms and conditions of the RFP may not be excluded from consideration. Ensure this is not in your email, but a part of your official proposal document.
20. The Following Checked FAR and DFARS Clauses Are Applicable to This Purchase by Reference and By Full Text. The Full Text of The Clauses/Provisions from The FAR and DFARS Can Be Accessed Via the Internet Using the Following Web -Site Addresses:
FAR - https://acquisition.gov/far/index.html
DFARS - www.acq.osd.mil/dpap/dars/dfarspgi/current/
21. Method of Payment: DFARS Clause 252.232-7006, Wide Area Workflow Payment Instructions, and incorporating DFARS Clause 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
**Full Document with Clauses and Provisions attached to posting**
The Department of the Navy, specifically the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), is soliciting quotes for a firm-fixed-price, single-award indefinite delivery-indefinite quantity (IDIQ) contract to provide preventative and corrective maintenance for General Electric (GE) Structurix M-Eco Radiography Film Processors. The contractor will maintain three units across two locations: two processors at PSNS & IMF in Bremerton, Washington, and one processor at Naval Air Station North Island (NASNI) in San Diego, California. The scope includes bi-annual preventative maintenance, onsite unscheduled inspections and repairs, and follow-on repairs. The performance period is scheduled to run from September 1, 2025, through August 31, 2030, covering a maximum of five years.
This requirement is identified under solicitation number N4523A25Q1412 and is being conducted via full and open competition with no set-aside. The primary classification for this procurement is NAICS 811210: Electronic and Precision Equipment Repair and Maintenance, with a corresponding PSC of J066: Maintenance, Repair, and Rebuilding of Equipment – Instruments and Laboratory Equipment. Qualifying vendors must be Waygate-authorized (formerly GE) dealers with a minimum of five years of experience repairing GE Type 5203/300 Structurix M-Eco processors and direct access to original equipment manufacturer (OEM) parts.
Responses to this combined synopsis/solicitation are due by September 11, 2025. Submissions must include a formal proposal on company letterhead, completed pricing for all contract line item numbers (CLINs), and documentation such as previous invoices to substantiate proposed pricing. The government intends to evaluate offers based on the criteria in FAR 52.212-2, awarding to the proposal most advantageous to the government regarding specifications and delivery schedules. The solicitation includes 10 attachments, which provide the Performance Work Statement, maintenance checklists, and a record of questions and answers submitted during the open period.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.