Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 8, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 8, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 8, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BV26QA061¬iceType=CombinedSynopsisSolicitation | LINK | May 8, 2026 |
Oologah Work Barge Motors
Contact and place of performance
Tyler Hastings
Not specified
The Tulsa Corp of Engineers is issuing a solicitation for outboard motors under W912BV26QA061.This specification is for the purchase and installation of two new 115 4-strokeoutboard motors, Twin engine control box, throttle and shift cables, stainless steel props, main engine harness, key switch, analog tachometer(s)/speedometer/hour meter(s)/voltage gauge(s)/fuel gauge/trim gauge(s), fuel/water separator assembly(s), trim and oil harness, and a hydraulic steering system for a Monark 24?Work Barge for the Oologah Lake Project Office in Rogers County, Oklahoma.
The U.S. Army Corps of Engineers, Tulsa District, is issuing a combined synopsis/solicitation under solicitation number W912BV26QA061 for the procurement and installation of outboard motors. This requirement entails the delivery and setup of two new 115 4-stroke outboard motors for a Monark 24-foot work barge at the Oologah Lake Project Office in Rogers County, Oklahoma. The scope of work includes the installation of a twin engine control box, throttle and shift cables, stainless steel props, a main engine harness, a key switch, and a hydraulic steering system. Additional components required include analog gauges for tachometers, speedometers, hour meters, voltage, fuel, and trim, as well as fuel/water separator assemblies and trim and oil harnesses.
This federal opportunity is classified under NAICS code 333618 for Other Engine Equipment Manufacturing and PSC 2805 for Gasoline Reciprocating Engines, Except Aircraft; and Components. The procurement is designated as an SBA Small Business Administration set-aside. Responses to this solicitation are due by June 8, 2026, following its initial publication on May 8, 2026. The primary point of contact for this requirement is Tyler Hastings, and the solicitation includes one PDF attachment published with the notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.