Name | Type | Posted | Actions |
|---|---|---|---|
44217 Final Report FY19 PMV080.pdf | Jun 27, 2022 | ||
Amendment 0004.pdf | Jun 27, 2022 | ||
15261 Final Report FY19 PMV080.pdf | Jun 27, 2022 | ||
70118 Final Report FY19 PMV080.pdf | Jun 27, 2022 | ||
Amendment 0003.pdf | Jun 27, 2022 | ||
A001 12 847597 TOWER- 65 SST MULTIPLE RAISED PLATFORMS.pdf | Jun 27, 2022 | ||
Amendment 0002.pdf | Jun 23, 2022 | ||
65 SS TOWER - MT. DIABLO - STAMPED STRUCTURAL ANALYSIS.pdf | Jun 23, 2022 | ||
70118_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
813509 R21 Tower San Onofre Peak Maintenance Report.pdf | Jun 10, 2022 | ||
813559_R21 Tower Mt Jenner_FY16.pdf | Jun 10, 2022 | ||
21206_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
15290_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
44217_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
17283_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
Amendment 0001- R1.pdf | Jun 10, 2022 | ||
17908_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
15255_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
15259_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
15261_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
15297_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
15301_Final Report_FY19_PMV080.pdf | Jun 10, 2022 | ||
813531_R21 Tower Cambria_FY16.pdf | Jun 10, 2022 | ||
TOWER 65 SST MULTIPLE RAISED PLATFORMS.pdf | Jun 10, 2022 | ||
Appendix A_Seed Project_USCG District 11 Towers.pdf | May 19, 2022 | ||
J.7_U.S. Coast Guard Safety and Environmental Health Manual_COMDTINST M5100.47.pdf | May 19, 2022 | ||
J.2_EXPERIENCE INFORMATION FORM.docx | DOCX | May 19, 2022 | |
J.3_PAST PERFORMANCE QUESTIONAIRE.docx | DOCX | May 19, 2022 | |
J.5_USCG District Map.pdf | May 19, 2022 | ||
J.6_U.S. Coast Guard Asbestos Exposure Control Manual_COMDTINST M6260-16.pdf | May 19, 2022 | ||
J.1_EXPERIENCE OVERVIEW SHEET.docx | DOCX | May 19, 2022 | |
Request for Proposal_70Z08822RESDV0001.pdf | May 19, 2022 | ||
J.8_U.S. Tower Manual_COMDTINST M11000.4.pdf | May 19, 2022 | ||
1.10.1_DBA_Wage Determination_Seed Project.zip | ZIP | May 19, 2022 | |
1.1.3_Final Specification SEED Project for National Tower Maintenance and Inspection IDIQ Contract_FY22.pdf | May 19, 2022 | ||
Enclosure 3- Appendix C_GTPermittingGuidelines.pdf | May 19, 2022 | ||
Enclosure 3- Appendix D_20130812_EIS Standard Protection Measures_final.pdf | May 19, 2022 | ||
Enclosure 3- Appendix F_Sea Turtle and Small Tooth Sawfish Construction Conditions.pdf | May 19, 2022 | ||
Enclosure 3- Appendix E_Standard Manatee Conditions for In-Water Work.pdf | May 19, 2022 | ||
Finalized_Source Selection Plan_TMACC.pdf | May 19, 2022 | ||
Appendix A_Seed Project_USCG District 13 Towers.pdf | May 19, 2022 | ||
CONTRACTOR REQUEST FOR CLARIFICATION.pdf | May 19, 2022 |
Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)
Contact and place of performance
—
Not specified
No narrative description provided for this notice.
Solicitation number 70Z08822RESDV0001, issued by the U.S. Coast Guard, establishes a Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC). This federal initiative focuses on construction services related to tower and antenna infrastructure across various locations. As of the last update on April 5, 2023, the procurement documentation includes 42 attachments, such as final reports, structural specifications for towers and raised platforms, and several formal amendments.
The solicitation is categorized under NAICS code 237130 for Power and Communication Line and Related Structures Construction and PSC code Y1AZ for Construction of Other Administrative Facilities and Service Buildings. While the primary notice was published on May 19, 2022, recent updates include technical reports and structural data for specific project sites. The associated files provide detailed engineering information and administrative revisions necessary for the completion of the IDIQ requirements.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.