Name | Type | Posted | Actions |
|---|---|---|---|
1305M326Q0029 Amendment 0001 FINAL.pdf | May 19, 2026 | ||
Attachment 2 - Site Photos for UPS Replacements.pdf | May 8, 2026 | ||
Attachment 1 - PWS MRX OHX and FFC UPS Replacement.pdf | May 8, 2026 | ||
Combined Synopsis Solicitation 1305M326Q0029 FINAL.pdf | May 8, 2026 |
Uninterrupted Power Supply Replacements at Morristown (MRX), Nashville (OHX), and Atlanta, GA (FFC)
Contact and place of performance
Jack Huckleby
Fort Worth, TX 76102
USA
This requirement is for the National Oceanic and Atmospheric Administration (NOAA), National Weather Service (NWS) Southern Region (SR), Weather Forecast Offices (WFO) at the Morristown (MRX), Nashville (OHX) and Atlanta (FFC) locations. The purpose of this requirement is to supply and install the Eaton 93PM UPS system, with lithium battery backup for 15 minutes, at each of the three WFO locations as well as provide the removal and disposal of the existing UPS’s, battery cabinet with batteries and any associated debris.
See Attached Combined Synopsis Solicitation 1305M326Q0029 FINAL
The National Oceanic and Atmospheric Administration (NOAA) requires the replacement of Uninterrupted Power Supply (UPS) systems at three National Weather Service Weather Forecast Offices located in Morristown (MRX), Nashville (OHX), and Atlanta (FFC). This project involves supplying and installing Eaton 93PM UPS systems featuring lithium battery backups capable of providing 15 minutes of power. The scope of work also includes the removal and disposal of existing UPS units, battery cabinets, batteries, and all associated debris.
The procurement is identified under solicitation number 1305M326Q0029 and is designated as a WOSB (Woman-Owned Small Business) set-aside. The primary classifications for this requirement are NAICS 335910 for Battery Manufacturing and PSC 6140 for Rechargeable Batteries. Performance is managed through the regional office in Fort Worth, TX, with Jack Huckleby serving as the point of contact.
Responses to this solicitation are due by June 5, 2026. The administrative record for this opportunity includes four attachments: the combined synopsis solicitation, a performance work statement, site photos for the replacements, and a final amendment issued on May 19, 2026. All work must adhere to the specifications detailed in the associated solicitation documentation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.