Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P8626Q0033_Amd_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_H_-_Maritime_Museum_4th_Floor_Mural_Report_2024_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_J_-_3rd_Floor_Ceiling_Tile_HAZMAT_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_F_-_Prismatarium_Conservation_of_H_H__Psych_Color_Chart_Rm_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_D_-_Condition_and_Treatment_Report_3rd_Flr_Murals_2023_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_E_-_Overpaint_Removal_Test_3rd_Floor_of_Bathhouse_2015_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_G_-_Womens_Lounge_Mural_Treatment_Report__0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_I_-_Finish_Analysis_Maritime_Museum_(2021)_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_K_-_4th_Level_Lead_Initial_Report_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_07_-_DOC_L_-_GUIDANCE_on_SSSP_0001.pdf | Jun 2, 2026 | ||
ATTACHMENT_02_-_140P8626Q0033_-_SOW.pdf | May 30, 2026 | ||
ATTACHMENT_01_-_140P8626Q0033_-_CONTRACT_PRICE_SCHEDULE.xlsx | XLSX | May 30, 2026 | |
ATTACHMENT_03_-_140P8626Q0033_-_DOL_WD_SCA_-_SAN_FRANCISCO_COUNTY.pdf | May 30, 2026 | ||
ATTACHMENT_06_-_140P8626Q0033_-_Bathhouse_Photos.pdf | May 30, 2026 | ||
ATTACHMENT_05_-_140P8626Q0033_-__Bathhouse_Drawings_-_Mural_and_Exposure_Window_Locations.pdf | May 30, 2026 | ||
Sol_140P8626Q0033.pdf | May 30, 2026 | ||
ATTACHMENT_04_-_140P8626Q0033_-_RELEVANT_EXPERIENCE_FORM.pdf | May 30, 2026 |
R--SAFR BATHHOUSE MURAL MAINTENANCE 2026
The National Park Service is seeking quotes for mural maintenance and color investigation at the Aquatic Park Bathhouse in San Francisco Maritime National Historical Park. This project involves assessing, cleaning, and analyzing historic murals across several areas, including the Prismatarium, the Women's Lounge, and the third and fourth floors. The work focuses on preserving WPA-era artwork and requires specialized conservation expertise to handle complex materials and documented hazardous substances. This is a 100% Small Business Set-Aside with a performance period from September 1, 2026, to December 15, 2026. Proposals must address technical capability, past performance, and pricing for four specific contract line items. A site visit is scheduled for June 10, 2026, ahead of the June 18, 2026, deadline. Supporting documents provide technical and historical context, including previous treatment reports, hazardous material inspections, and site photographs. Amendment 0001 added twelve technical documents that establish baselines for color matching, safety planning, and lead-based paint assumptions, including specific paint codes from Benjamin Moore and Sherwin Williams. The solicitation includes technical references, historical reports, and hazardous material assessments. These documents cover previous conservation work, specific paint codes, and lead-based paint data that must be integrated into safety and technical planning. Amendment 0001 requires assuming lead paint is present in all work areas. Work must be performed by a conservator with a Master's degree and professional status in the American Institute for Conservation (AIC).
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Gabriel, Michael
Not specified