Name | Type | Posted | Actions |
|---|---|---|---|
Bid Abstract - W912BU26BA007 Maintenance Dredging Philadelphia to Trenton (KO Signed).pdf | May 26, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Apr 22, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 22, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 22, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BU26BA007¬iceType=SolicitationNotice | LINK | Apr 22, 2026 |
Maintenance Dredging, Delaware River, Philadelphia to Trenton
Maintenance Dredging, Delaware River, Philadelphia to Trenton
Contact and place of performance
Connor Struckmeyer
Not specified
The Purpose of Amendment 0001 to Solicitation W912BU26BA007 is as follows:a.) Provide answers to the RFIs submitted.b.) Update DFARS 252.236-7001 to include XYZ data. Additionally, revise Specification Section 3520 23, Appendix B41, W912BU26BA007-DWG_AM0001.pdf, and Plan Sheet C-401.c.) Add FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors.d.) Add FAR 52.219-9 Small Business Subcontracting Plane.) Up...
View moreThe U.S. Army Corps of Engineers, Philadelphia District, is soliciting bids under solicitation number W912BU26BA007 for maintenance dredging of the Delaware River between Philadelphia and Trenton. The base contract involves mechanically dredging approximately 500,000 cubic yards of sediment from the main navigation channel between Newbold Range and Cochran Range to a depth of 24 feet MLLW plus one foot of allowable overdepth. Dredged material from the base work will be placed in the Biles Island Disposal Area in Falls Township, Pennsylvania. An optional requirement includes dredging an additional 70,000 cubic yards from the Fairless Turning Basin to a depth of 41 feet MLLW plus one foot of allowable overdepth, with placement at the Money Island Disposal Area.
This project is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KF, Maintenance of Dredging Facilities. The estimated magnitude of the construction project is between $10,000,000 and $25,000,000. The performance period is 240 calendar days from the notice to proceed, and all dredging must be completed by March 15, 2027, to comply with environmental restrictions. Responses are due by May 22, 2026, and must be submitted through the PIEE Solicitation Module.
Connor Struckmeyer serves as the point of contact for this requirement. The solicitation was published on April 22, 2026, and was last updated on May 26, 2026, to include a bid abstract and an amendment addressing requests for information and updates to contract clauses and specifications. Two PDF attachments are associated with this notice, including the bid abstract signed by the contracting officer and an initial solicitation document.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.