Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P5225R0018_Amd_0002.pdf | Jul 16, 2025 | ||
Sol_140P5225R0018_Amd_0001.pdf | Jul 2, 2025 | ||
Solicitation_Clauses.pdf | Jul 1, 2025 | ||
A04_SOW_NATT_Bridge_Construction_Blackland_Prairie_Section_near_Milepost_261_1.pdf | Jul 1, 2025 | ||
Sol_140P5225R0018.pdf | Jul 1, 2025 | ||
B03_Wages_Lee_County.pdf | Jul 1, 2025 |
M--TRAIL BRIDGE BLACKLAND PRAIRIE
Contact and place of performance
Clark, Tara
Not specified
Amendment 0002: Amendment 0002 We had a few questions so we are sharing the answers below. All other terms, conditions, and times remain the same. BIDS ARE DUE JULY 17,2025 AT 2:00CT. One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are...
View moreThe National Park Service has issued solicitation 140P5225R0018 for the construction of a trail bridge in the Blackland Prairie section near Milepost 261.1. This project is classified under NAICS 237310 Highway, Street, and Bridge Construction and PSC M1LB Operation of Highways, Roads, Streets, Bridges, and Railways. The scope involves the installation of pre-fabricated bridges, which include delegated design responsibilities specifically for the manufacturer-built components.
Technical requirements for the bridge construction specify that diaphragms may be bolted to the girders, while bearing plates must be welded. To minimize corrosion over time, all hardware, girders, bearing plates, and diaphragms must be coated using galvanization, epoxy, or powder coating. Steel angle nailer brackets must be spaced at a maximum of five feet on center along the length of the bridge. While the pre-fabricated bridge elements fall under delegated design, all other components must be constructed without deviation from the provided plans.
Responses to this combined synopsis/solicitation are due by July 17, 2025, at 2:00 PM CT. The solicitation includes six attachments, such as the statement of work for the Blackland Prairie section, wage determinations for Lee County, and technical amendments answering contractor inquiries. Tara Clark is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.