Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P5225R0018_Amd_0002.pdf | Jul 16, 2025 | ||
Sol_140P5225R0018_Amd_0001.pdf | Jul 2, 2025 | ||
Solicitation_Clauses.pdf | Jul 1, 2025 | ||
A04_SOW_NATT_Bridge_Construction_Blackland_Prairie_Section_near_Milepost_261_1.pdf | Jul 1, 2025 | ||
Sol_140P5225R0018.pdf | Jul 1, 2025 | ||
B03_Wages_Lee_County.pdf | Jul 1, 2025 |
M--TRAIL BRIDGE BLACKLAND PRAIRIE
Contact and place of performance
Clark, Tara
Not specified
Amendment 0002: Amendment 0002 We had a few questions so we are sharing the answers below. All other terms, conditions, and times remain the same. BIDS ARE DUE JULY 17,2025 AT 2:00CT. One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are...
View moreThe National Park Service has issued solicitation 140P5225R0018 for the construction of a trail bridge in the Blackland Prairie section near Milepost 261.1. This requirement is classified under NAICS 237310 Highway, Street, and Bridge Construction and PSC M1LB Operation of Highways, Roads, Streets, Bridges, and Railways. The project scope involves the installation of pre-fabricated bridges, which includes delegated design responsibilities for elements produced by the manufacturer.
Technical requirements for the project involve specific assembly standards, including the welding of bearing plates to girders and the use of corrosion-resistant coatings such as galvanization, epoxy, or powder coating for hardware and steel components. Diaphragms may be bolted or welded to the girders but must include connection brackets on both sides and at each end. Additionally, steel angle nailers must be spaced at a maximum of five feet on center along the length of the bridge. Contractors are expected to maintain the provided design plans with minimal deviation.
Responses to this combined synopsis and solicitation are due by July 17, 2025, at 2:00 PM CT. The procurement documentation includes six attachments: two amendments, a statement of work, wage determinations for Lee County, solicitation clauses, and the primary solicitation document. Tara Clark is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.