Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 11 - RFI Questions REV 1.docx | DOCX | Jun 3, 2026 | |
36C26026R0044 0005.docx | DOCX | Jun 3, 2026 | |
Wage Determination Spokane County Revised 5-18-2026.pdf | Jun 3, 2026 | ||
36C26026R0044 0001.docx | DOCX | May 29, 2026 | |
36C26026R0044 0003.docx | DOCX | May 29, 2026 | |
36C26026R0044 0002.docx | DOCX | May 29, 2026 | |
Attachment 11 RFI Questions.docx | DOCX | May 29, 2026 | |
36C26026R0044 0004.docx | DOCX | May 29, 2026 | |
Attachment 12 Specs Section 078100.pdf | May 29, 2026 | ||
Attachment 1 - SOW - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 | ||
Attachment 10 - VA Site Visit Campus Map - Bldg 5.pdf | Apr 23, 2026 | ||
36C26026R0044_1.docx | DOCX | Apr 23, 2026 | |
Attachment 9 - Wage Determination Spokane - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 | ||
Attachment 8 - Limitations on Subcontracting - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 | ||
Attachment 7 - Price Breakout - 668-21-100 AHU 18 20 22.xlsx | XLSX | Apr 23, 2026 | |
Attachment 6 - Contractor Rules of Behavior - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 | ||
Attachment 5 - Past Performance Questionnaire - 668-21-100 AHU 18 20 22.docx | DOCX | Apr 23, 2026 | |
Attachment 4 - Environmental Report - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 | ||
Attachment 3 - Specs - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 | ||
Attachment 2 - Drawings - 668-21-100 AHU 18 20 22.pdf | Apr 23, 2026 |
Y1DA--CON 668-21-100 Upgrade AHUs 18-20-22 Mechanical Systems
The Department of Veterans Affairs is seeking proposals for mechanical system upgrades at the Mann-Grandstaff VA Medical Center in Spokane, Washington. Project 668-21-100 involves replacing three existing air handling units (AHUs 18, 20, and 22) with four new units. The work includes electrical upgrades, steam and chilled water piping, and integration with the facility's Schneider EcoStruxure Building Automation System. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a 650-calendar day performance period. Five amendments have been issued, with Amendment 0005 setting the final proposal deadline for June 15, 2026. Requirements include the use of a temporary air handler for AHU-18, infection control measures, and a staffing plan that provides three separate individuals for the Site Safety and Health Officer, Quality Control Manager, and Superintendent roles. The prime contractor must perform at least 15% of the contract cost, and all work must comply with Davis-Bacon Act wage rates for Spokane County. Technical requirements focus on hospital continuity through phased work and temporary equipment. A temporary air handler is required for AHU-18, and infection control barriers must be maintained. Work may need to occur after hours or on weekends to minimize noise. Specifications cover fireproofing, structural steel, and interfaces with Schneider EcoStruxure, Fire Systems West, and Control Solutions North West. Contractors must provide a temporary air handling system for AHU-18 to maintain operations. Phasing is required because of limited space for patient relocation. While the VA moves users, the contractor moves furnishings within the work area. Standard hours are 0700 to 1600, but noise-sensitive work may require evening or weekend c…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Quyen Mai
Spokane, WA 99205
USA
See RFP 36C26026R0044_1 and attachments.