Name | Type | Posted | Actions |
|---|---|---|---|
Questions_Answers_Step2.0_28June24v2.pdf | Jul 2, 2024 | ||
ATTACHMENT 9 - IDIQ SECTION L INSTRUCTIONS FOR PROPOSAL_v2.pdf | Jul 1, 2024 | ||
Questions_Answers_Step2_28June24v2.pdf | Jul 1, 2024 | ||
STEP 2.0_IDIQ_Section Jv2.pdf | Jun 28, 2024 | ||
ATTACHMENT 12 Gateway Questionnaire_Response Form v2.pdf | Jun 14, 2024 | ||
Questions_Answers_13Jun24.pdf | Jun 14, 2024 | ||
Solicitation FA880924RB0010001.pdf | Jun 14, 2024 | ||
Attachment 13 Prior Customer Questionnaire v2.pdf | Jun 14, 2024 | ||
Attachment 17 SF328-18b.pdf | Jun 14, 2024 | ||
Attachment 17 SF328-18b.pdf | May 23, 2024 | ||
Attachment 15 IDIQ_CDRL Table.pdf | May 23, 2024 | ||
Attachment 13 Prior Customer Questionnaire.pdf | May 23, 2024 | ||
Attachment 12 Gateway Questionnaire_Response Form.pdf | May 23, 2024 | ||
ATTACHMENT 10 IDIQ SECTION M EVALUATION FACTORS.pdf | May 23, 2024 | ||
ATTACHMENT 8 DD 2794 IDIQ CSDR Plan v2.xlsx | XLSX | May 23, 2024 | |
Attachment 7 IDIQ_OCI Checklist.pdf | May 23, 2024 | ||
Attachment 6 ON OFF RAMPING PROC.pdf | May 23, 2024 | ||
Attachment 4 DD254 FA880924RB001.pdf | May 23, 2024 | ||
ATTACHMENT 5 Ordering Guide.pdf | May 23, 2024 | ||
Attachment 3 Spacecraft and Ground Technical Specification Sheet (SGTSS).pdf | May 23, 2024 | ||
Attachment 2 Systems Requirement Document (SRD) (3).pdf | May 23, 2024 | ||
Attachment 1 Statement of Work (SOW).pdf | May 23, 2024 | ||
Vendor_Registration.pdf | May 23, 2024 | ||
Solicitation - FA880924RB001Final.pdf | May 23, 2024 | ||
FA880924RB001 RFP STEP 2.pdf | May 23, 2024 | ||
Attachment 20 Compliance-Reference Table.pdf | May 23, 2024 | ||
Attachment 19 Acronym List.pdf | May 23, 2024 |
RFP - Space Test Experiments Platform (STEP) 2.0
RFP - Space Test Experiments Platform (STEP) 2.0
Contact and place of performance
Larry D. Asberry Jr
Kirtland AFB, NM 87117
USA
Amendment 0004 1. DD 254 submission is no longer required. As a result, all references to the DD 254 were removed from Attachment 9, Instructions to Offerors. The language in amendment 2 clarifying the DD 254 is superseded here takes precedence. Amendment 0003 The following changes were incorporated into this amendment: 1. Modified Section J to mention Attachment 11, which will be provided by the Offeror. This attach...
View moreThe Department of the Air Force, specifically the Space Systems Command (SSC/SZK-IK), has issued solicitation FA880924RB001 for the Space Test Experiments Platform (STEP) 2.0 program. This requirement is classified under NAICS 633414 for Guided Missile and Space Vehicle Manufacturing and PSC 1555 for Space Vehicles. The STEP 2.0 program establishes a Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract to procure proven spacecraft and space access for science and technology experiments. The vehicle enables the execution of delivery orders that align payload, space vehicle, and launch vehicle schedules with on-orbit operational capability.
The anticipated period of performance for the IDIQ includes a five-year base period and one five-year option period. Most work will allow contractors to propose either Firm Fixed Price or Cost Plus Fixed-Fee solutions, though the government anticipates Firm Fixed Price for each spacecraft solution offered. While all data and reports line items are designated as Not Separately Priced, they must mirror the contract type proposed for the associated work. The primary place of performance is Kirtland Air Force Base, New Mexico, and the solicitation involves 27 total attachments, including a Gateway Questionnaire, Prior Customer Questionnaire, and updated instructions for proposal submission.
Proposals must be submitted through the Procurement Integrated Enterprise Environment (PIEE) by July 12, 2024. Offerors intending to compete for classified task orders were previously addressed regarding DD 254 submissions; however, current amendments indicate that a DD 254 submission is no longer required at this stage and references to it have been removed from the instructions to offerors. Classified mission information included in the Prior Customer Questionnaire must follow specific submission instructions and may not be sent directly to the primary contracting point of contact, Larry D. Asberry Jr.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.